Uponor Combi Port BASE XU l Installation manual l 13
3.3
Mounting UFH manifold
1
Mark for drilling wholes for UFH manifold.
Note
Pay attention to horizontal alignment!
2
Drill holes.
3
PDQLIROGZLWKHQFORVHG¿[LQJPDWHULDOWRWKHZDOO
Connect UFH manifold to the ball valves on the station.
3.4
Connection underfloor heating pipes
Note
Construction and installation of underfloor heating
acc EN 1264.
1
&RQQHFWLRQRIXQGHUÀRRUKHDWLQJSLSHVRQWKHPDQLIROG
2
Protocol the loop lengths of each loop
SW 24
SW 30