© UPLIFT Desk
• 1-800-349-3839 • [email protected] • www.upliftdesk.com
3
Part Description
Qty
Leg 2
Foot 2
Crossbar end
2
Crossbar rail
2
Side bracket
2
Adhesive pads
10
Control box
1
Keypad 1
Cables
(Power & two connector cables)
3
Cable clips
(not pictured)
10
M6x14 Machine screw
24
M6x10 Machine screw
8
#10x5/8’’ Wood screw
(not pictured)
12
#10-24x5/8’’ Machine screw
(not pictured)
8
or
Please count all pieces before disposing of any carton or packing material. Use a padded or carpeted
area for assembly to avoid damage. For ease and safety, we recommend two people for assembly.
Connector cables, qty 2
Power cable, qty 1
Leg
(qty 2)
Control box
(qty 1)
Adhesive
pads
(qty 10)
Cables
M6x10
Machine screw
(qty 8)
#10x5/8’’
Wood screw
(qty 12)
#10-24x5/8’’
Machine screw
(qty 8)
Cable clip
(qty 10)
Crossbar end
(qty 2)
Crossbar rail
(qty 2)
Side bracket
(qty 2)
M6x14
Machine screw
(qty 24)
Keypad
(one of two types, qty 1)
or
Philips Head Screwdriver
and/or Power Drill
Tape Measure
Allen wrench
(included)
Tools required
Components
1
1
1
2
2
2
3
3
4
4
5
5
5
6
6
7
7
7
8
8
8
9
9
10
10
11
11
12
12
11
11
11
11
11
11
11
11
a
a
b
b
13
13
13
13
Configuration
9
6
3. PARTS LIST
12
Foot
(includes leveling pads
qty 2)