18
2.3 Step 9
At this point it is necessary to determine where the control
panel
will go as this dictates the side the
control
box
is mounted to. The control box should be mounted on the side closest to the future
control panel location. Control panel location is entirely personal preference. Install the control box
to the spreader bar tabs as shown using 4 x M6x10mm screws.