![Unitek TV3.230 Series Manual Download Page 19](http://html1.mh-extra.com/html/unitek/tv3-230-series/tv3-230-series_manual_4039349019.webp)
3 Electrical Installation
TV3.2
19
Ready for operation signal BTB
Relay RL1
signal contact
X2:12 - X2:13
contact values
max. 48V, 0.5A
The ready for operation signal (BTB) shows the CNC/SPS
that the drive is ready for operation.
switch BTB- signals of several axes in one row.
delay after switching on mains >>>
max. 1sec.
Indication
ready for operation
LED green bright
contact closed
error
LED red bright
contact open
BTB turns off with
overtemperature
controller, motor
stored
overvoltage
stored
short-circuit, line-to-earth-fault
stored
voltage error
not stored
intermediate circuit error
not stored
To reset store switch off/on enable
Caution:
Use BTB-contact always with CNC/SPS - control
or with emergency-stop circuit !
Self-starting possible!
fault memory
- is not effective with all faults!
Signal blocked
current demand
normal
overload
output X2:14
>+12V
<+2V
Analogue measuring outputs
function
motor current indication
speed- indication
connection
X2:9 - X1:7
X2:8 - X1:7
measuring value
2.5V = type current
tacho voltage
5.0V = peak current
before divider
unipolar positive
bipolar
output resistance
1 k
W
4.7 k
W
S
ig
n
a
ls
Summary of Contents for TV3.230 Series
Page 1: ...MANUAL Servo Drive TV3 230 xx for DC Servomotors with DC Tachometer TV3 230 Edition 0109...
Page 9: ...2 Mechanical Installation TV3 2 9 Multi Axes Combination...
Page 11: ...3 Electrical Installation TV3 2 11 Connection Overview...
Page 22: ...Transistor Servo Drive TV3 230 22 Block Diagram...
Page 26: ...Transistor Servo Drive TV3 2 26 Empty page...