2-1-1
U29PMEN
STANDARD MAINTENANCE
Service Schedule of Components
This maintenance chart shows you the standard of replacement and cleaning time for each part.
Because those may change depending on environment and purpose for use, use the chart for reference.
Notes:
1.Clean all parts for the tape transport (Upper Drum with Video Head / Pinch Roller / ACE Head / FE Head) using
90% lsopropyl Alcohol.
2.After cleaning the parts, do all DECK ADJUSTMENTS.
3.For the reference numbers listed above, refer to Deck Exploded Views.
H: Hours
: Cleaning
I
: Change
Deck
Periodic Service Schedule
Ref.No.
Part Name
1,000 H
2,000 H
3,000 H
4,000 H
B2
Cylinder Assembly
I
I
B3
Loading Motor Assembly
I
B8
Pulley Assembly
I
I
B587
Tension Lever Assembly
I
I
B31
ACE Head Assembly
I
B573, B574
Reel (SP)(D2), Reel (TU)(D2)
I
B37
Capstan Motor
I
I
B52
Cap Belt
I
I
B73
FE Head
I
B133, B134
Idler Gear, Idler Arm
I
I
B410
Pinch Arm(A) Assembly
I
I
B414
M Brake (SP) Assembly
I
I
B416
M Brake (TU) Assembly
I
I
B525
LDG Belt
I
I
B569
(2 head only)
Cam Holder
I
I
B593
(4 head,
4 head HiFi
only)
Cam Holder Assembly
I
I
Summary of Contents for TVC5044
Page 17: ...1 5 4 T6627DC Fig 4 S 11 S 11 S 11 S 11 Anode Cap 11 CRT CRT CBA...
Page 36: ...Main 1 5 Schematic Diagram 1 8 3 1 8 4 T6627SCM1...
Page 37: ...Main 2 5 Schematic Diagram 1 8 5 1 8 6 T6627SCM2...
Page 38: ...Main 3 5 Schematic Diagram 1 8 7 1 8 8 T6627SCM3...
Page 39: ...Main 4 5 Schematic Diagram 1 8 9 1 8 10 T6627SCM4...
Page 40: ...1 8 11 1 8 12 T6627SCM5 Main 5 5 Schematic Diagram...
Page 42: ...1 8 15 1 8 16 H V Power Supply 2 2 Schematic Diagram T6627SCP2...
Page 43: ...1 8 17 1 8 18 T6627SCCRT CRT Schematic Diagram...
Page 44: ...1 8 19 1 8 20 T6627SCT Text Schematic Diagram...
Page 53: ...1 14 3 T6627PEX Packing S3 S6 X3 S2 X4 X1 TAPE S1 FRONT S4 X2 3 X2 7 X2 14 X2 15...
Page 86: ...2 4 9 Z13PDA Fig DM16 43 41 42 L 13 Fig DM17 44 45 Slide P 9...