MAKE
ESPRESSO COFFEE
Coffee/steam switch button: set the state of making coffee or making steam
PUMP button: to control the pump
ON button
Green indicator: The flashing of green indicator
indicates preheating process, the green indicator
is illuminated, it indicates you can make steam
Green indicaror: the flashing of green indicator
indicates preheating process, the green indicator
is illuminatecd, it indicates you can make coffee
Indicator of ON (red)
O N
TIM E
O N
O N
H O U R
M IN
PR O G
PU M P
O N
1.
Remove the funnel by turning it in clockwise, .Add ground coffee to steel mesh with measuring
spoon, a spoon ground coffee power can make about a cup of top-grade coffee, then press the
ground coffee powder tightly with the tamper.
2.
Set steel mesh into metal funnel, pull the press bar backward, then insert the funnel into the
appliance from the “Insert” position, and you can fix them into coffee maker firmly through turn
it anticlockwise until it is at the
lock
position (See fig. 1).
3.
Pour out the hot water in the cup. Then place the hot cup (yourself cup) on removable shelf.
4. At the time, the green lamp is illuminated, if the green lamp is flashing, wait for a moment, once
the green lamp is illuminated, you should press the PUMP button, waiting for a moment, there will be
coffee flowing out.
Note:
During operation, if the green indicator is flashing, you must close the pump and stop to make
espresso coffee. After a few seconds, if the green lamp is illuminated again, you can make espresso
coffee continued by pressing PUMP button again, the green lamp is cycle on and flash to maintain the
water temperature is hot enough.
5. You should press down
ON
button manually when desired coffee is obtained or the colour of coffee
changes weak obviously, the indicator of ON and green indicator go out and the coffee maker stops
working, your coffee is ready now.
Note:
From pressing ON button, unit will power off automatically after 25 minutes, if there is any other
operation (except steam knob), power off time will be counted from new operation.
WARNING
: Do not leave the coffee maker unattended during making the coffee, as you need operate
manually sometimes!
6. After finishing making the coffee, you can take the metal funnel out through turn clockwise, then
pour the coffee residue out with the steel mesh pressed by press bar.
7. Let them cool down completely, then rinse under running water.
Summary of Contents for EM5186
Page 12: ...1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18...
Page 13: ...19 20 21 23 24 25 26 27 28 29 30 31 32 33...
Page 14: ...A K B L C M D N E O F P G Q H R I S J T...
Page 15: ...10 11 12 1 13 OFF 14 12 00 15 16 17 ON PUMP PUMP PUMP 18 20 1...
Page 19: ...1 O OFF 2 PUMP PUMP 3 OFF PUMP 20 4 100 70 2 5 2 6 OFF 7 8 5 Fig 4...
Page 20: ...1 2 12 00 OFF 3 PUMP 4 OFF PUMP 20 5 6 7 OFF 8 5 6 7 8...
Page 21: ...1 2 3 2 4 1 3 4 PUMP 5 PUMP 5 6 2 OFF 15 7 4 6 3 8 PUMP 9 4 6 3 15 6 10 9 3 1 25 4 1...
Page 22: ...15 3 5 3...