background image

-8-

FACTORY BUILT CHIMNEY

When a metal prefabricated chimney is used, the manufacturer’s 

installation instructions must be followed. You must also purchase 

(from  the  same  manufacturer)  and  install  the  ceiling  support 

package or wall pass-through and “T” section package, firestops 

(where needed), insulation shield, roof flashing, chimney cap, etc. 

Maintain  proper  clearance  to  the  structure  as  recommended 

by the manufacturer. The chimney must be the required height 

above the roof or other obstructions for safety and proper draft 

operation.

MASONRY CHIMNEY

Ensure that a masonry chimney meets the minimum 

standards of the National Fire Protection Association (NFPA) 

by having it inspected by a professional. Make sure there 

are no cracks, loose mortar or other signs of deterioration 

and blockage. Be sure to the chimney cleaned before the 

stove is installed and operated. When connecting the stove 

through a combustible wall to a masonry chimney, special 

methods are needed.

Summary of Contents for VOGELZANG VG2020

Page 1: ...nstallation Could Void Your Warranty Certified to UL 1482 2011 R2015 and ULC S627 00 R2016 Mobile home approved U S ONLY U S Environmental Protection Agency Certified to comply with 2020 particulate e...

Page 2: ...CONTACT MAY CAUSE SKIN BURNS DO NOT USE CHEMICALS OR FLUIDS TO IGNITE THE FIRE DO NOT LEAVE THE STOVE UNATTENDED WHEN THE DOOR IS SLIGHTLY OPENED DO NOT BURN GARBAGE FLAMMABLE FLUID SUCH AS GASOLINE N...

Page 3: ...to the top of the unit as shown using the 3 5 16 18 x 1 1 2 bolts 3 washers and 3 weld tabs provided in the parts box FIREBRICK CONFIGURATION Replace the Firebrick as shown in the illustration 5 16 1...

Page 4: ...e the most time is spent and in the most spacious room possible Recall that wood stoves produce radiating heat the heat we feel when we are close to a wood stove A wood stove also functions by convect...

Page 5: ...E 12 12 305 305 F 22 22 559 559 D B A C E F E D B A C E F E Slide the hose clamp over the aluminium flex pipe Then slide the flex pipe over the air intake tube of the stove Next tighten the hose clamp...

Page 6: ...MUST BE ATTACHED TO THE STRUCTURE OF THE MOBILE HOME SECURING APPLIANCE S ON A PEDESTAL TO THE FLOOR Use the designated holes to secure the unit to the floor SECURING APPLIANCE S WITH LEGS TO THE FLOO...

Page 7: ...e into the room through appliance and chimney connector joints An uncontrollable burn or excessive temperature indicates an excessive draft CHIMNEY Your wood stove may be hooked up with a 6 factory bu...

Page 8: ...as recommended by the manufacturer The chimney must be the required height above the roof or other obstructions for safety and proper draft operation MASONRY CHIMNEY Ensure that a masonry chimney meet...

Page 9: ...nd a minimum 24 gage ventilated wall thimble which has two air channels of 1 25 4 mm each construct a wall pass through There shall be a minimum 6 152 4 mm separation area containing fiberglass insula...

Page 10: ...rain or snow also accelerates the drying time A good indicator of if the wood is ready to burn is to check the piece ends If cracks are radiating in all directions from the center then the wood shoul...

Page 11: ...ling on it and close the door If the piece ignites within 90 seconds from the time it was placed into the stove your wood is correctly dried If ignition takes longer your wood is damp If your wood his...

Page 12: ...t going up the chimney as lost energy Therefore efficiency calculated using the lower heating value of wood will be higher than the efficiency calculated using the higher heating value In the United S...

Page 13: ...these gases is somewhere between 275 F and 500 F Below these temperatures the build up of creosote is promoted Above 500 F heat is wasted since a too large quantity is lost into the atmosphere TO PREV...

Page 14: ...e sold The glass should be washed only when cold PAINT Only clean your stove with a dry soft cloth that will not harm the paint finish If the paint becomes scratched or damaged it is possible to give...

Page 15: ...nt VG2020 BP 1 9 610960 Pedestal Weldment VG2020 BP 1 10 610925 Ashpan Housing VG2020 BL 1 11 610883 Leg Weldment VG2020 BL 4 12 25826 Hearth Plate 1 13 29216 Ash Pan 1 14 610927 Damper Slide Weld 1 1...

Page 16: ...Description Qty 1 83788 Socket Head Screw 1 2 893062 Roller Sleeve 1 3 893156 Wooden Thru Handle 1 4 893164 Door Handle 1 5 891373 Door Hinge Pad Threaded 2 6 40880 Lg Square Cast Door 1 7 88066 Rope...

Page 17: ...17 Notes...

Page 18: ...18 Notes...

Page 19: ...7 Date _____________________ Engineer Name ________________________________ License No ____________________________________ Company _____________________________________ Telephone No _________________...

Reviews: