13/22
EN
ROOF-PASS FIXING (NOT INCLUDED)
•
Drill through bulkhead using a hole saw. Diameter between 15 and 20mm.
•
Clean the fixing area with a degreaser. Do not use alcohol/white spirit.
•
Put glue on the indicated zone (in white on the image below), and place the roof-pass on the
drilled area.
•
Run the cables. Keep a sufficient length for wiring. Tighten the gland nuts to ensure a proper sealing.
2 glue threads