12/22
www.uniteck.fr
EN
UNIFIX
–
PANEL FIXING (FOLLOWING)
•
Put 4 glue threads on each underside of the mounting brackets (previously degreased).
•
Place the whole set on the fixing area previously degreased.
Respect 24 hours of drying time. Do not move or manipulate during this time.
During drying time, you can fix the roof-pass (product not included, cf. roof-pass part)
!