Jetball Alley 2P GMP Manual
11/02/2019
13
Glass
Mounting
metal plate
Baffle plate
Mounting metal plate
Erection column
Lock
Lane side plate
Lane side plate
Lock
Step 3
Place the Baffle plates horizontally beneath the Monitor assembly and install the
side indicated by oval to the Monitor assembly as shown below.
4 ends of the Baffle plates are with erection columns. Stick 2 erection columns in 2
mounting metal plates.
Note: Staffs need to hold the monitor assembly and the glass frame during the installation.
Step 4
Locate Lane assembly. Unlock and remove 2 Lane side plates. Locate Monitor
assembly. Place the other side of the Baffle frame downward as shown below and stick 2
erection columns in 2 mounting metal plates on the Lane assembly. Install two lane side
plates back.
Step 5
Locate the Glass frame. Stick the Glass frame on the mounting metal plates screws
and tighten the screws.
Summary of Contents for JETBALL ALLEY
Page 1: ...IMPORTANT Operation Manual...