Jetball Alley 2P GMP Manual
11/02/2019
11
Main cabinet
Lane assembly
Baffle plate
Net A
Net B
4.4 Machine Installation
Note: Machine without PC is No.1 machine. Machine with PC is No.2 machine.
No.2 machine need to install on the right side.
Before processing with assembly assure you have the following tools.
No.
Name
Picture
1
Phillips screwdriver
2
Allen wrench
3
Ladder
Kit list:
No.
Name
Size
Qty
Picture
1
Cross recessed pan head screw M4×20 black 28
2
Cross recessed pan head screw M4×35 black 12
3
Cross recessed pan head screw M4×25 black 12
This machine is divided into 11 parts: Main cabinet(2 pcs); Lane assembly(2 pcs); Baffle
frame(4 pcs); Net A(8 pcs); Net B(2 pcs); L marquee(1 pcs); R Marquee(1 pcs); Middle
Marquee(1 pcs); Marquee vertical metal plate(2 pcs); Marquee horizontal metal plate(1
pcs); Marquee metal plate(1 pcs); Please contact UNIS Service in case of any abnormality.
No.1 machine
No.2 machine
Summary of Contents for JETBALL ALLEY
Page 1: ...IMPORTANT Operation Manual...