8
Assembly Instructions
Unique Inventions Inc.
est 1984
559 Chamberlain St.
Peterborough, ON CANADA
www.uniqueinventionsinc.com
Out of the Box Assembly
You will receive the following items:
1 . Bucket (Seat Belts & Over Armour) attached to Frame
2. Ballistic Frame / Side Tubes / Frame Stiffener / Foot Strap
3. Nose with Plastic Skag
Tools Required
7/16” Wrench
3/8” Wrench
5/32” Allan wrench
The Ballistic
1
2
3
1. Slide side tubes out and remove foot support
strap. Re-insert side tubes.
2. Slide Foot support on.
3. Slide nose piece into side tubes.
4. Secure nose with bolts provided and then
tighten all the bots on the sled.