10.0  UNPACKING AND INSPECTION

10.1

  This PDUAC3U Series PDU was carefully tested, inspected and packaged for 

shipment from our factory.   Upon receipt of the unit it should be carefully unpacked 

and inspected for any damage in shipment.

10.2

  If there is evidence of damage, do not attempt to test the unit.  The freight carrier 

should be notified immediately and a claim for the cost of the rectifier system should 

be filed with the carrier for direct reimbursement. Be sure to include the model and 

serial number of the damaged unit in all correspondence with the freight carrier.  

Also save the shipping carton and packing material as evidence of damage for the 

freight carrier’s inspection.

10.3

  UNIPOWER will cooperate fully in case of any shipping damage investigation.

10.4

  Always save the packing materials for later use in shipping the unit.  Never ship the 

unit without proper packing.

11.0 INSTALLATION

11.1 Mounting.

  This PDU can be mounted in 19-inch racks by using the supplied 

brackets.  Mount it from the front of the rack using the correct offsets to align with 

existing rack-mounted equipment. 

11.2 

Input Connections.

  Input connections should be made with stripped end wire of 

size #2AWG.  See Section 9.2.

 

Connections should be made according to the source voltage as follows:

 

120VAC Line-Neutral

 

Connect each phase to L1, L2 & L3 respectively.  Connect neutral to N.

 

208VAC Line-Line

 

Connect each phase to L1, L2 & L3 respectively.  Connect neutral to N.

 

230VAC Line-Neutral

 

Connect each phase to L1, L2 & L3 respectively.  Connect neutral to N.

 

11.3 

Output connections are made to barrier strip connectors and grounding screws.  See 

Section 9.3 and Figure 5.

Summary of Contents for PDUAC3U-120-08

Page 1: ...l No PDUAC3U 3 2017 UNIPOWER LLC All Rights Reserved pduac3u man rev3 0317 indd UNIPOWER LLC 3900 Coral Ridge Drive Coral Springs Florida 33065 USA sales unipowerco com North America 1 954 346 2442 La...

Page 2: ...DUCTION 4 2 0 FEATURES OPTIONS 5 3 0 PRODUCT LINE 5 4 0 SAFETY INDUSTRY STANDARDS 6 5 0 WARRANTY summary 6 6 0 DESCRIPTION OF OPERATION 7 7 0 SPECIFICATIONS 8 8 0 FRONT PANEL DESCRIPTION 8 9 0 BACK PA...

Page 3: ...Y Manual No pduac3u 3 pduac3u man rev3 0317 indd FIGURES Figure 1 PDUAC3U AC Power Distribution Unit 4 Figure 2a Block Diagram Single Phase 7 Figure 2b Block Diagram Three Phase 7 Figure 3 Front Panel...

Page 4: ...ure load babance on the source They provide AC distribution and overload protection for up to 12 load circuits distributed through field wireable terminal blocks There are 3 basic configurations opera...

Page 5: ...NAL AC OUTPUT OUTPUTS 1 PDUAC3U 120 04 NO 120 208VAC 3 phase 4 wire GND 120VAC Line Neutral 4 x 25A PDUAC3U 120 08 8 x 25A PDUAC3U 120 12 12 x 25A PDUAC3U 208 04 120 208VAC 3 phase 4 wire GND 208VAC L...

Page 6: ...se of power systems and are well aware of the hazards involved 4 4 All connections to the PDU should be carefully checked for errors before applying power to them 4 5 The internal voltages may be at h...

Page 7: ...l is not distributed This latter provides a 208VAC output Option SP 25A L3 L2 L1 N CB12 N CB11 N L2 L3 CB10 N L1 CB9 L3 N CB8 N CB7 N L1 L2 CB6 N L3 CB5 L2 N CB4 L1 N CB3 L3 N CB2 L2 N CB1 25A CB12 25...

Page 8: ...Black Powder Coat Dimensions Inches mm 5 1h x 16 75w x 11 5d 43 2 x 425 5 x 292 1 Rack Mounting 19 or 23 3U High Weight 23lbs 10 5Kg FIELD WIRING CONNECTIONS Input L1 L2 L3 N GND Cable Compression 2A...

Page 9: ...cks marked GND N L1 L2 L3 The recommended cable size for these connections is 2AWG 9 3 Output Connections Output connections are shown in Figure 4 There are 3 sets of barrier strip terminals The conne...

Page 10: ...eight carrier s inspection 10 3 UNIPOWER will cooperate fully in case of any shipping damage investigation 10 4 Always save the packing materials for later use in shipping the unit Never ship the unit...

Page 11: ...ctions is made Make sure that all connections are clean and secure to minimize contact resistance 11 5 UL Requirements The following should be adhered to when installing this PDU Elevated Operating Am...

Page 12: ...rce off connect the input wires to the PDU Set all circuit breakers to on 13 3 Turn on the input power source Check the output voltage at each set of output terminals with a digital voltmeter 13 4 Swi...

Page 13: ...ther options that do not affect safety Rating PDUAC3U 230 yy SP 230 400Vac 100A per phase 50 60Hz 3ph 4W G Output 200 240Vac max 20A per output L N 4 outputs per phase PDUAC3U 120 yy SP 120 208Vac 100...