background image

                     Service manual Phyaction V

 

 

 

 

 

Service manual version 0.1

 

 

 

Page 1

 

1.

 

Contents 

 
1.

 

............................................................................................................................. 1

 

Contents

2.

 

............................................................................................................................... 2

 

Preface

3.

 

.............................................................................................................. 3

 

Important remarks

3.1

 

................................................................................................................ 3

 

Safety aspects

3.2

 

.............................................................................................................. 3

 

Data registration

4.

 

.................................................................................................................... 5

 

Technical data

4.1

 

.................................................................................................... 5

 

General technical data

4.2

 

................................................................................................ 5

 

Environmental conditions

4.3

 

.................................................................................................... 5

 

Transport and storage

5.

 

............................................................................................................... 6

 

Circuit description

5.1

 

.................................................................................................................. 6

 

Power supply

5.2

 

.................................................................................................. 6

 

Patient Current Routing

5.3

 

........................................................................................................................... 6

 

Vacuum

5.3.1

 

............................................................................................................ 6

 

Control Loop

5.3.2

 

........................................................................................................ 6

 

Pulsed Vacuum

5.3.3

 

..................................................................................................... 7

 

End of Treatment

5.3.4

 

................................................................................................. 7

 

Water management

6.

 

............................................................................ 8

 

Safety inspection list ( yearly check-up )

7.

 

................................................................................................................. 9

 

Hardware labels.

7.1

 

....................................................................................... 9

 

Upgrading the hardware code.

8.

 

................................................................................................. 10

 

Replacement procedures

8.1

 

............................................................................................................ 10

 

Opening the unit

8.2

 

.............................................................................. 11

 

Replacement of power supply PCB

8.3

 

..................................................................................... 11

 

Replacement of the Main PCB

9.

 

.......................................................................................................................... 12

 

Upgrades

9.1

 

.................... 12

 

Vacuum pump switches of after 2 minutes even when current is flowing

10.

 

.................................................................................................................. 13

 

Spare parts list

11.

 

............................................................................................. 13

 

Schematics and PCB layout

 

Summary of Contents for Phyaction V

Page 1: ...pply 5 2 6 Patient Current Routing 5 3 6 Vacuum 5 3 1 6 Control Loop 5 3 2 6 Pulsed Vacuum 5 3 3 7 End of Treatment 5 3 4 7 Water management 6 8 Safety inspection list yearly check up 7 9 Hardware lab...

Page 2: ...r of the Uniphy family it is built according to the requirements of the MDD security standards All functions of the unit are controlled by a microprocessor ensuring a high degree of reliability and sa...

Page 3: ...e able to provide the following data for each unit Instrument data Part and serial number Gymna has the original configuration of each unit The Phyaction V has following critical parts Ref 324597 Main...

Page 4: ...er name Customer address Instrument name Serial number Date of delivery Service activities Date Error complaint Service action Critical spare parts exchange list Critical part name Old serial number N...

Page 5: ...socket required Insulation Type BF floating patient circuit Fuses 2 x T2AL250V Volume water reservoir 180 ml Working pressure continuous vacuum 38 320 hPa Working pressure pulsation vacuum 58 480 hPa...

Page 6: ...el B by pressing a button that toggles the choice between traditional and vacuum electrodes 5 3 Vacuum When the vacuum control is turned up air is pumped out to create the vacuum until the set level i...

Page 7: ...avoidably droplets are sucked into the system These droplets do not only contain water but also fibers from the sponges flakes of skin and other substances present under the cups To prevent these to r...

Page 8: ...the keys and the display are undamaged Mains entry and power cord are undamaged The output connectors are undamaged The electrode connectors and cables are undamaged All the operation functions work T...

Page 9: ...ut The last 3 alphanumerical numbers will begin with A A A to Z Increase in case of a principle technology change Components are not anymore compatible with the previous layout All previous changes ma...

Page 10: ...ing static sensitive devices such as PC boards of the Phyaciton V the following precautions should be observed Persons should be earthed by means of a wrist strap Ground all electrical equipment work...

Page 11: ...pply PCB Unscrew the 4 screws of the power supply PCB and replace with a new PCB 8 3 Replacement of the Main PCB The main PCB is one board in production that is divided over the front of the unit To r...

Page 12: ...m the patient We have noticed that is some cases the vacuum is switched off even when there is current detected In order to solve this the unit needs to be modified Step 1 open the unit Step 2 remove...

Page 13: ...324597 MAIN PCB PHYACTION V VACO 200 324650 CABLE ASSY ET IN VACO500 PHYACTION V 324727 CABLE ASSY MAINS INLET SMPS 200 SERIES 324793 BOTTOM BOX PHYACTION V 324804 METAL TOP COVER PHYACTION V 324837 C...

Page 14: ......

Page 15: ......

Page 16: ......

Page 17: ...R247 ELVA003 LO200 V21 pcb Tue Dec 13 10 38 58 2005...

Page 18: ......

Reviews: