21
5 Transport, setup and acceptance
NOTE
Generally, the process gas analyser is started up by Union Instruments GmbH or
service technicians.
If it is not transported, set up and started up by Union Instruments GmbH (for
example in-house transportation and resale), coordinate the appropriate
procedure with Union Instruments GmbH (
Chapter 12 Service).
5.1 Transport
WARNING
Possible injury from the process gas analyser tipping over or falling from pallets
and load carrying equipment.
•
At least two persons are required to unpack and transport the analyser (for
weight see technical data)!
•
Check the load bearing capacity and condition of the slinging equipment and
carefully attach it.
•
Never stand under suspended loads!
NOTE
In case of transport damage indicating improper handling, the carrier should
perform a damage report within seven days (railway, post office, freight
forwarder).
Summary of Contents for INCA4004
Page 3: ...3 Dimensions ...
Page 4: ...4 ...
Page 8: ...8 ...
Page 12: ...EU Declaration of Conformity 12 ...
Page 32: ...Transport setup and acceptance 32 ...
Page 34: ...Startup switching on 34 ...
Page 48: ...Operation 48 ...
Page 50: ...Decommissioning switching off 50 ...
Page 54: ...Maintenance 54 ...
Page 58: ...Service 58 ...
Page 60: ...Accompanying documents 60 ...
Page 62: ...Disposal 62 ...
Page 64: ...Spare parts 64 ...
Page 65: ...65 16 Annex ...
Page 66: ...Annex 66 EU Declaration of Conformity Flame arrester ...
Page 67: ...Annex 67 ...