Transport, setup and acceptance
22
5.4.2 Process gas
NOTE
•
The connecting parts need to be clean and free of residue. Impurities can
enter the process gas analyser and cause incorrect measurements and/or
damage.
•
The inlet pressure for the gas connections must not exceed the pressure
specified on the instruction sticker on the process gas analyser.
•
Each connection needs to be carefully checked for leaks. If there are any
leaks, the system will draw air, and the measurements will be incorrect.
•
Do not use sealing compound to seal the gas connections as this can lead to
inaccurate measurements. Use PTFE sealing tape.
•
Only use suitable pipes.
•
Use a separate line to drain off the condensate.
ATTENTION
The process gas must be free of condensate and dust if the process gas analyser
has no gas preparation system (or gas cooler).
Summary of Contents for INCA3021
Page 3: ...3 Dimensions ...
Page 10: ...EU Declaration of Conformity 10 ...
Page 30: ...Transport setup and acceptance 30 ...
Page 32: ...Startup switching on 32 ...
Page 46: ...Operation 46 ...
Page 48: ...Decommissioning switching off 48 ...
Page 52: ...Maintenance 52 ...
Page 56: ...Service 56 ...
Page 58: ...Associated documents 58 ...
Page 60: ...Disposal 60 ...
Page 62: ...Spare parts 62 ...
Page 63: ...63 16 Annex ...
Page 64: ...Annex 64 EU Declaration of Conformity Flame arrester ...
Page 65: ...Annex 65 ...