5.4.2 Process gas
NOTE
•
The connecting parts need to be clean and free of residue. Impurities can
enter the process gas analyser and cause incorrect measurements and/or
damage.
•
The inlet pressure for the gas connections must not exceed the pressure
specified on the instruction sticker on the process gas analyser.
•
Each connection needs to be carefully checked for leaks. If there are any
leaks, the system will draw air, and the measurements will be incorrect.
•
Do not use sealing compound to seal the gas connections. Sealing compound
can distort measurements. Use PTFE sealing tape.
•
Only use suitable pipes.
•
Use a separate line to drain off the condensate.
ATTENTION
The process gas must be free of condensate and dust if the process gas analyser
has no gas preparation system (or gas cooler).
Summary of Contents for INCA1021
Page 3: ...3 Dimensions ...
Page 10: ...EU Declaration of Conformity 10 ...
Page 16: ...Safety equipment 16 3 2 Markings and warnings Fig 3 1 Markings and warnings 1 Type plate 1 ...
Page 44: ...Operation 44 ...
Page 46: ...Decommissioning switching off 46 ...
Page 50: ...Maintenance 50 ...
Page 54: ...Service 54 ...
Page 56: ...Associated documents 56 ...
Page 58: ...Disposal 58 ...
Page 60: ...Spare parts 60 ...
Page 61: ...61 16 Annex ...
Page 62: ...Annex 62 EU Declaration of Conformity Flame arrester ...
Page 63: ...Annex 63 ...