19
5 Transport, setup and acceptance
NOTE
Generally, the process gas analyser is started up by Union Instruments GmbH or
service technicians.
If it is not transported, set up and started up by Union Instruments GmbH (for
example in-house transportation and resale), coordinate the appropriate
procedure with Union Instruments GmbH (
Chapter 12 Service).
5.1 Transport
WARNING
Possible injury from the process gas analyser tipping over or falling from pallets
and load carrying equipment.
•
At least two persons are required to unpack and transport the analyser (for
weight see technical data)!
•
Check the load bearing capacity and condition of the slinging equipment and
carefully attach it.
•
Never stand under suspended loads.
NOTE
In case of damage during transport from improper handling, the carrier should
perform a damage report within seven days (railway, post office, freight
forwarder).
Summary of Contents for INCA6002
Page 3: ...3 Dimensions ...
Page 10: ...EU Declaration of Conformity 10 ...
Page 30: ...Transport setup and acceptance 30 ...
Page 32: ...Startup switching on 32 ...
Page 46: ...Operation 46 ...
Page 48: ...Decommissioning switching off 48 ...
Page 52: ...Maintenance 52 ...
Page 56: ...Service 56 ...
Page 58: ...Associated documents 58 ...
Page 60: ...Disposal 60 ...
Page 62: ...Spare parts 62 ...
Page 63: ...63 16 Annex ...
Page 64: ...Annex 64 EU Declaration of Conformity Flame arrester ...
Page 65: ...Annex 65 ...