OPERATING INSTRUCTIONS
CWD2005 SPC
chapter
— page:
5
—6
5.4.1 Setup site
The installation location of the system must meet the following requirements:
•
Observe the requirements acc. to the technical data, especially the ambient
conditions and the IP protection type.
•
clean room
•
protected from direct weather impact and direct sunlight
•
Insure a clean, sufficient amount of compressed/ambient air for undistorted
measurements
•
Ensure that the load-bearing capacity of the environment is sufficient
•
Design sufficient space on the sides for mounting and connecting lines
•
install according to the requirements of explosion protection marking
WARNING
Leaking process gas needs to be discharged by the operator into a safe
environment!
NOTE
The compressed air must be dry and free from dust and oil!
Humid, dirty air will distort the measurement results of the analyser.
Summary of Contents for CWD2005 SPC
Page 1: ...Feb 2017 V1 02 OPERATING INSTRUCTIONS AND SAFETY NOTES CWD2005 SPC...
Page 4: ...OPERATING INSTRUCTIONS CWD2005 SPC...
Page 10: ...OPERATING INSTRUCTIONS CWD2005 SPC chapter page 2 2...
Page 42: ...OPERATING INSTRUCTIONS CWD2005 SPC chapter page 5 18...
Page 56: ...OPERATING INSTRUCTIONS CWD2005 SPC chapter page 7 8...
Page 58: ...OPERATING INSTRUCTIONS CWD2005 SPC chapter page 8 2...
Page 60: ...OPERATING INSTRUCTIONS CWD2005 SPC chapter page 9 2...
Page 63: ...OPERATING INSTRUCTIONS CWD2005 SPC chapter page 10 3...