![Unigas R91A Manual Of Installation - Use - Maintenance Download Page 13](http://html.mh-extra.com/html/unigas/r91a/r91a_manual-of-installation-use-maintenance_842319013.webp)
C.I.B. UNIGAS
- M039231CB
13
Key
* Note: the high gas pressure switch can be mounted either upstream the gas valve or downstream the gas valves but upstream the
butterfly gas valve.*
Gas train - 2
(Rp2)
Gas train with valves group MBC 1200SE (2 gas pressure governor) + VPS504 gas proving system
Gas train - 3
(DN65/80/100)
Gas train with valves group MBC 1900/3100/5000SE (2 gas pressure governor) + VPS504 gas proving system
1
Burner
2
Butterfly valve
4
Maximum gas pressure switch (optional)
5
Minimum gas pressure switch
6
Gas filter
7
Bellows unit
8
Manual cutoff valve
10
VGD Valves group
16
PGCP - gas leakage pressure switch
18
MBC Valves group (2” with filter provided)
19
MBC Valves group (DN65/80/100)
1
2
5
4
7
8
18
16
4
MANUFACTURER
INSTALLER
1
2
5
4
7
8
18
16
4
MANUFACTURER
INSTALLER