PART II: INSTALLATION
23
MultiBloc MB-DLE -
Assembling the gas train
- Example of gas train
MULTIBLOC DUNGS MB-DLE 405..412
Mounting
1. Mount flange onto tube lines: use appropriate sealing agent (see Fig. 8);
2. insert MB-DLE: note position of O rings (see Fig. 8);
3. tighten screws A, B, C and D (Fig. 6 - Fig. 7), accordind to the mounting positions (Fig. 9);
4. after installation, perform leakage and functional test;
5. disassembly in reverse order.
2
MULTIBLOC DUNGS MB-DLE 415..420
Mounting
1. Loosen screws A and B
do not
unscrew (Fig. 10 - Fig. 11).
2. unscrew screws C and D (Fig. 10 - Fig. 11).
3. Remove MultiBloc between the threaded flanges (Fig. 11).
4. After mounting, perform leakage and functional tests.
Fig. 7
Fig. 8
Fig. 9
Fig. 10
Fig. 11
Fig. 12
Fig. 13
Fig. 14
Keys
1 Gasket
2 Gas filter
3 Gas valves group
4 Bellows unit
41Manual valve
F”direction” arrows for
installation
gas supply network
1
5
1
4
1
2
1
3
1
A
B
C
D
MOUNTING POSITIONS
A
B
C
D
D
C
B
A
MOUNTING POSITIONS
Summary of Contents for P75R
Page 53: ...Service manual AZL2x LMV2x 3x Burner Management System M12916CD Rev 3 4 03 2023...
Page 60: ...8 Parameters level heating engineer...
Page 102: ...50 ERROR CODE TABLE...
Page 103: ...51...
Page 104: ...52...
Page 105: ...53...
Page 106: ...54...
Page 107: ...55...
Page 108: ...56...
Page 109: ...57...
Page 110: ...58...
Page 111: ...59...
Page 112: ...60...
Page 113: ...61...
Page 114: ...62...
Page 115: ...63...
Page 116: ...64...
Page 121: ......
Page 122: ......
Page 123: ......
Page 125: ...IG FU B...
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 133: ......
Page 134: ......
Page 135: ......