PART II: INSTALLATION
16
GAS TRAIN CONNECTIONS
The diagrams show the components of the gas trai included in the delivery and which must be fitted by the installer.The diagrams are in
compliance with the current laws.
Gas train with valves group VGD and MBE with built-in gas pressure go gas leakage pressure switch (PGCP)
Legend
MultiBloc MB-DLE - Assembling the gas train
1 Filter
6 Butterfly valve
2 Pressure switch - PGMIN
7 Pressure transducer
3 Safety valve with built in gas governor
8 Main burner
4 Proving system pressure switch - PGCP
9 Antivibration joint (*optional)
5 Pressure switch PGMAX: mandatory for MBE, optional for VGD and MB-DLE
10 Manual valve(*optional)
MULTIBLOC DUNGS
MB-DLE 405..412
MB-DLE 415..420
Mounting
1
Mount flange onto tube lines: use appropriate sealing agent
2
Insert MB-DLE: note position of O rings
3
Remove MultiBloc between the threaded flanges
4
After installation, perform leakage and functional test
5
Disassembly in reverse order
M
PS
PSL
PSH
PT
7
MBE
1
9
10
M
PS
PSL
PSH
VGD
1
9
10
gas inlet
gas inlet
supplied by burner constructor
by others
A
B
C
D
(A)
MOUNTING POSITIONS
A
B
MB-DLE 405.. 412
(B)
(C)
(D)
MB-DLE 415.. 420
(O-Ring)