PART II: INSTALLATION
15
Gas train with valves group VGD and MBE with built-in gas pressure go gas leakage pressure switch (PGCP)
Legend
Gas train with valves group MB-DLE (2 gas pressure governor)
Gas train with valves group VGD with built-in gas pressure governor
Gas train with valves group MB-DLE (2 gas pressure go pressure switch) + gas leakage pressure switch
(PGCP)
1 Filter
6 Butterfly valve
2 Pressure switch - PGMIN
7 Pressure transducer
3 Safety valve with built in gas governor
8 Main burner
4 Proving system pressure switch - PGCP
9 Antivibration joint (*optional)
5 Pressure switch PGMAX: mandatory for MBE, optional for VGD and MB-DLE
10 Manual valve(*optional)
GAS INLET
by burner constructor
by others
by others
supplied by burner constructor
gas inlet
10
by others
supplied by burner constructor
gas inlet
M
PS
PSL
PSH
PT
7
MBE
1
9
10
M
PS
PSL
PSH
VGD
1
9
10
gas inlet
gas inlet
supplied by burner constructor
by others
Summary of Contents for E150X
Page 43: ......
Page 45: ...Service manual AZL2x LMV2x 3x Burner Management System M12916CD Rev 3 4 03 2023...
Page 52: ...8 Parameters level heating engineer...
Page 94: ...50 ERROR CODE TABLE...
Page 95: ...51...
Page 96: ...52...
Page 97: ...53...
Page 98: ...54...
Page 99: ...55...
Page 100: ...56...
Page 101: ...57...
Page 102: ...58...
Page 103: ...59...
Page 104: ...60...
Page 105: ...61...
Page 106: ...62...
Page 107: ...63...
Page 108: ...64...
Page 113: ......
Page 114: ......
Page 115: ......