18
Installation of the mounting frame
To install the unit on raised flooring using the mounting fra-
me, carry out the following procedures:
•
a flexible seal at least 5 mm thick should be fitted
between the raised floor panels and the mounting frame
which should also be isolated from the metallic floor
structure;
•
position the unit of the mounting frame and fix it using
the M8 screw inserts found on the base of the unit.
Installation on flooring which is not raised
Installation on flooring which is not raised can occur without
using bases, but only on upflow models
(upwards air flow) with rear or frontal air intake. Installation on
this type of floor does not require any additional operation
besides that of normal positioning.
Installation of the floor stand
To install the unit on the floor stand, carry out the following
procedures:
•
position the unit on the floor stand;
•
fix the unit to the floor stand using the M8 screw inserts
found on the base of the unit.
basamento
condizionatore
zoccolo
unità
Door opening and removal of the panels
Door opening
To open the door of the unit, carry out the following procedu-
re:
•
push the button and pull the handle lightly outwards;
•
turn the handle downwards until the door opens.
Removal of the front and side panels
To remove the front and side panels, carry out the following
procedure:
•
firmly hold the panel;
•
lift and incline the panel outwards until it is completely
removed.
Q.E.
NOTE: After having removed the side panels, the non-
removable protective panel, blocks accessibility to the inside
of the machine.
Removal of the rear panels
To remove the rear panels, carry out the following procedure:
•
unscrew, using a star screwdriver, the screws which fix
the panel at the top of the machine;
•
firmly hold the panel;
•
lift and incline the panel outwards until it is completely
removed.
Fixing screws
Flexible seal
Flexible seal
Mounting
frame
Raised
floor
Air conditioning unit
Base of unit
Floor stand