Unicont SPb PCH-205 Operating Manual Download Page 15

Unicont SPb Ltd 

 

Technical Documentation PCH-205 

 Page 

15 

 

3.

 

Deliver cables of connected devices to the PS. When selecting, use the cable with an 

appropriate core section (see Cable Core Section Table, Table 7 and Figure 9). 

Table 7. Types of Cables and Section of the Cores Connected to the Terminals of PCH-205 

 

Terminal 

Terminal Purpose  

Terminal Name 

 

Core 

Section 

 

Recommended 

Cable Types  

1 J1.1 Connection of SB 

BATTERY INPUT 

16 mm

2

 

КМПВ

(

Э

) (2 

х

 16) 

J3.2 

Connection of load  
(0 ... 20 

А

24 VAC Output 

4 mm

2

 

КМПВ

(

Э

) (2 

х

 4) 

3 24 

VAC 

Output 

4 J3.1 

Connection of load  
(0 ... 40 A) 

24 VAC Output 

10 mm

2

 

КМПВ

(

Э

) (2 

х

 6) 

5 J3.6 

Connection of load  
(0 ... 10 A) 

24 VAC Output 

2.5 mm

2

 

КМПВ

(

Э

) (2 

х

 1.5)

6 J3.5 

24 

VAC 

Output 

7 J3.4 

24 

VAC 

Output 

8 J3.3 

24 

VAC 

Output 

9 J5 

Connection of input 
supply 

220 VAC INPUT 

6 mm

2

 

КМПВ

(

Э

) (3 

х

 1.5)

10 J11 

Connection of an alarm 
unit  

AU-106 

1.5 mm

2

 

КУПЭВ

  

(2 

х

 2 

х

 0.5) 

11 J9 

Connection of a 
temperature sensor  

TS 

КУПЭВ

  

(2 

х

 2 

х

 0.5) 

12 

J14 

Connection of storage 
battery control unit  

Remote/Bat_control 

КМПВ

(

Э

) (2 

х

 0.5)

J8 

КУПЭВ

  

(2 

х

 2 

х

 0.5) 

 
4.

 

Remove the device lid. 

5.

 

Pass connecting wires of the power supply circuit, electric power storage, etc. of the 

connected devices through the gaskets located at the bottom part of the device housing. 

IMPORTANT!

 Before delivering cables to the PS, make sure in lack of voltage in 

them. 

6.

 

Earth the PS housing in the commom earthing bus of the vessel. An earthing bolt is 

located from the right side at the bottom part of the PS housing (see Figure 8). 

7.

 

Connect wires of the storage battery and external device to the terminals of the 

charging device according to the connection diagram (Figure 9). 

8.

 

Check compliance of onboard supply with the requirements of the OM (220 V, 

50/60 Hz). 

9.

 

Connect a power supply cable to the terminals of PS “220 VAC INPUT” (see Figure 

9) according to the following designation: 

Wire of the phase 
Protective earth 

Neutral wire  

Summary of Contents for PCH-205

Page 1: ...Unicont SPb Ltd Power Supply Automatic Battery Charger PCH 205 Technical Documentation 205 1 27062012 St Petersburg 2012...

Page 2: ...3 SPECIFICATIONS 6 4 SAFETY ENGINEERING INSTRUCTIONS 7 5 OPERATION PRINCIPLE 8 6 CONTROLS AND INDICATORS 9 7 INSTALLATION AND CONNECTION 14 8 ALARM SIGNALS OF PCH 205 19 9 TRANSPORTATION AND STORAGE 2...

Page 3: ...aintenance This Manual can also be used as a source of information about to draw up corresponding sections in the operational documentation for the equipment this product may be used as its component...

Page 4: ...H 205 1 ps 2 Operator s manual 1 ps The following devices can be used additionally optionally with this product 1 Control panel of storage batteries BCP 136 2 Alarm unit AU 106 3 Temperature sensor of...

Page 5: ...Unicont SPb Ltd Technical Documentation PCH 205 Page 5 Figure 1 Base Configuration PCH 205 Figure 2 Configuration PCH 205 with Integrated Control Figure 3 Configuration PCH 205 with Remote Control...

Page 6: ...ly from the supply main connection of SB with reverse polarity protection of the battery against deep discharge a deactivated function overheat protection of PS CHD overheat protection of SB when usin...

Page 7: ...engineering Instructions IMPORTANT Do not allow contact of the device with water and water penetration into the device IMPORTANT When cleaning the device surface do not use organic solvents to avoid...

Page 8: ...the SB When restoring supply voltage the switching unit automatically switches the load to supply from the power supply unit and charge of SB is resumed in automatic mode Thus the device allows automa...

Page 9: ...PS state and operation mode see Figure 5 and an audio alarm acknowledgement button 1 LEDs AC Present DC Output Charging ALARM are designed to indicate current operation mode see Figure 5 Table 3 2 But...

Page 10: ...ose of the Buttons Table 4 Table 4 Purpose of Control Buttons Button Purpose SELECT Main menu option select button and Parameter value select button SET Mute Confirmation preservation button of the se...

Page 11: ...the diagram of voltage and charging current curves Figure 4 Failure red Flashes in case of SB discharging or abnormal operation mode of the device see Alarm Table Table 5 6 2 1 Structure of PS Configu...

Page 12: ...played on the right device indicator with buttons and set the required value of charging voltage press button SET to confirm the set value and its record into nonvolatile memory of the device 6 2 3 Ch...

Page 13: ...attery Note By default the PS is shipped set for connection with SB with operating voltage 24 V and has the following preset settings U 28 4 V I 20 A 6 3 Function of Battery Deep Discharge Protection...

Page 14: ...commended to be mounted on the vertical bulkhead IMPORTANT The PS shall be installed at a safe distance from a light port to prevent water penetration into the device when opening the light port IMPOR...

Page 15: ...2 2 2 0 5 11 J9 Connection of a temperature sensor TS 2 2 0 5 12 J14 Connection of storage battery control unit Remote Bat_control 2 0 5 J8 2 2 0 5 4 Remove the device lid 5 Pass connecting wires of t...

Page 16: ...Control by delivering with the digital indicators SB current and voltage values 12 Close the PS lid The following settings refer only to the device configuration with integrated control 13 In 5 secon...

Page 17: ...106 see Figure 9 The control panel of storage batteries BCP 136 is designed for remote control of any PS configurations see para 7 1 2 Connection is carried out with a standard interface RS 422 The c...

Page 18: ...evice is required Except for the main function of current value indication and device control BCP 136 backups audio and light alarm in alarm situations see para 8 Figure 11 External view BCP 136 When...

Page 19: ...hen switching on the PS Flashes Signal Open Connection of SB to the PS with reverse polarity actuates only when the PS is switched on Flashes Signal Open Overvoltage in the PS power circuit Flashes Si...

Page 20: ...port automobile and railway closed transport covered wagons universal containers by air in pressurized and heated bays of airplane by sea in dry service spaces The device shall be transported in accor...

Page 21: ...s You can also send the overage equipment to the manufacturer for its further recycling Proper recycling of the product components will prevent potential negative consequences for human health and the...

Page 22: ...condition or has a damaged body and other causes beyond the manufacturer s control 4 If self made electrical devices were used 5 If there was an attempt to repair the unit by a person who is not an au...

Page 23: ...rial number was manufactured and accepted in accordance with the regulatory requirements of the state standards and applicable technical documentation and is suitable for operation Quality control rep...

Reviews: