background image

5

Revised 15/12/21

01865 767676

[email protected]

www.unicol.com

AVMW – STEP 2

 

Identify floor plate, loosen grub screws to gain 
access to bottom holes. Measure 134mm (

a

) from 

the wall. (Consider skirtings). Mark and drill. Using 
suitable anchors fix floor plate.

NOTE:

 The wall has to be capable of supporting 5 

times the load of the combined display and unit.
Therefore, it may be necessary to reinforce the floor 
and wall before starting this installation.

AVMW – STEP 1

 

The rear of the unit is inaccessible once wall fitted 
so it is important to cable up first. (Do not fit screen).
When using a PZX1 or PZX3 for 33-70” screens, 
remove rear covers and follow AVMT Steps 2, 3 & 4.
When using a PZX9 for 71-100” screens, remove 
rear covers and follow AVMT Steps 2 & 4, but 
replace AVMT Step 3 with the above.

AVMW – STEP 3

Using the 4 x M10 x 25 hex head screws loosely fix 
one of the wall brackets to the top plate. Discard 
the other wall bracket. There is a small amount of 
adjustment in the slots, which can be used when 
levelling unit in the next step.  

AVMW – FLOOR TO WALL

a

Additional 
converter 
plate

STEP 2

 

As soon as power is connected you have 3 minutes 
to pair the App by pointing your phone at the unit. 
When bluetooth has connected your phone press 
‘Connect’. Continue to follow the instructions on 
the App to operate the unit. 

Note: This App was built for desks but is 
recommended by LINAK to operate this unit.

Hand Held Remote

LINAK Desk Control App

Summary of Contents for AVMT

Page 1: ...s the combined load of the solution and the hardware Never exceed the maximum load capacity Please also layout all components to ensure that you have all of the required parts before proceeding see BO...

Page 2: ...3 PZX Screen Mount Back Plate 1 4 PZX Screen Mount Mounting Arms 2 5 Remote Control 1 6 Manual Operating Switch cable 1 7 Top Bottom Fixings AVWM only 2 8 Wall Fixing Brackets AVWM only 2 9 PZX9 Conv...

Page 3: ...ead screws and remove the top cable cover to gain access to the 4 x Mount Backplate fixing holes If you are connecting an external network cable remove the bottom cover 4 screws AVMT STEP 3 Fit the PZ...

Page 4: ...ble train After cabling refit the cable cover by reversing actions in Step 2 All STEP 1 Operate the lift motor using manual switch hand held remote or LINAK Desk Control App Connect mains power Plug i...

Page 5: ...emove rear covers and follow AVMT Steps 2 3 4 When using a PZX9 for 71 100 screens remove rear covers and follow AVMT Steps 2 4 but replace AVMT Step 3 with the above AVMW STEP 3 Using the 4 x M10 x 2...

Page 6: ...lling unit to wall AVMW STEP 3 Decide the height on the wall where the bottom of the unit should be Mark and drill Use appropriate anchors and fix the bottom wall bracket NOTE The wall has to be capab...

Page 7: ...to wall fixings not supplied Tighten all screws in top and bottom brackets Follow Steps 5 7 8 of AVMT instructions to complete installation AVML7 Platform OPTIONAL STEP 2 OPTIONAL The Platform can be...

Reviews: