3.15 - BOILER START-UP
Have all the hydraulic and electrical systems and the safety devices been connected in compliance with the
domestic and local laws in force
?
Are the expansion vessel and the safety valve (when applicable) connected correctly and cannot be shut off?
are the bulbs of fl ow probe S4 and safety thermostat locked in the relevant sheaths?
Are the control and safety devices working and confi gured correctly?
Are the refractory coverings intact?
Is the grate of the burner installed correctly?
Are the combustion air intake line and the fl ue gas evacuation line compliant with the applicable standards in force?
Are the mains voltage and frequency compatible with the burner and the electrical equipment of the boiler?
Is the system full of water and does not contain any air?
Are the drain valves closed and the system cut-off devices fully open?
Is the outside main switch ON?
Is the pump/are the pumps working correctly?
has the system been checked for water leaks?
Are the ventilation conditions and minimum distances to perform any maintenance guaranteed?
Has the operator been trained and has the documentation been supplied?
3.15.1 - PRELIMINARY CHECKS
Commissioning must be done by profession-
ally qualifi ed personnel. Unical will not be
held liable for damage to persons, animals
or objects due to failure to comply with the
above instruction.
Please tick the operations performed
The preliminary checks must be carried out by the instal-
lation fi rm.
After connecting the hydraulic and electrical system and the fuel
line to the boiler, and before starting up the boiler,
it is advisable
to check the following:
YES
NO