55
Servicing schedule
Second phase - Cleaning
•
Remove the gaskets and the burners.
• Perform cleaning of the burners only by blowing, with com
-
pressed air, acting from the “side flame”
• Verify visually the state of the spot weldings of the L profiles
and the burner mesh.
The burner gaskets must be replaced at
every cleaning operation.
•
Wash with water the combustion chamber, avoiding to wet
the electrical harness
During this operation it will be necessary to ascertain that
the condensate drain pipe is free, so that the washing water
does not come out from the inspection hole.
•
Blow the combustion chamber with compressed air, trying to
remove all the dirt still fixed to the fins.
•
Once the washing of the aluminium sections is finished, make
sure the siphon for the evacuation of the condensate is free:
if necessary clean it
•
Ispect the smoke evacuation pipe and the chimney
Third phase – Reassembly
When reassembly, proceed in the reverse
order, taking care to tight the fixing screws
of the mixer/fan group to the body, with a
tightening torque of 13 Nm
WARNING
AT EACH MAINTENANCE OPERATION IT IS
COMPULSORY TO REPLACE THE SEALING
GASKETS ON EACH BURNER.
Spare parts code:
00251482
-
KIT OF BURNER GASKETS
MODULEX (5 pz.)
95262823
-
KIT BURNER MODULEX E8
• Before lighting the boiler make sure the si phon has been filled
with water.
• Before opening the gas feeding cock, previously unloosed,
make sure it is well tight. To do this open the gas cock and
check with a soap solution.
• When a single burner is started, check immediately for the
soundness between its gas valve and the relevant premixing
chamber.
• Perform the combustion analysis check its parameters.
• Make sure that all the pressure test nipples, previously
opened, have been closed.
• After the cleaning of the boiler body and/or the burners, re
position the burners in their seats.
• Position the new gaskets in
graphite
COMpRESSED AIR
Summary of Contents for MODULEX EXT 150
Page 1: ...E N G L I S H 100 150 200 250 300 350 INSTALLATION AND SERVICING INSTRUCTIONS MODULEX EXT...
Page 32: ...32 Instructions for the installer THERMOSTAT FBR 2 CONNECTION room sensor...
Page 33: ...33 Instructions for the installer MODULATING THERMOSTAT CONNECTIONS...
Page 35: ...35 Instructions for the installer...
Page 37: ...37 Instructions for the installer Sensor terminal assignments Terminal assignments BCM...