52
Servicing schedule
-
Release the fixing spring from the air manifold (on right
and left side).
-
Remove the red silicone pipes and then the air manifold
(left / right side).
•
Wiring
-
Release the plastic bands fixing the harness in the upper part
of the boiler (do not to cut the plastic bands)
-
Remove gas valve connector
-
Remove fan connector
-
Remove gas pressostat wires
Summary of Contents for MODULEX EXT 150
Page 1: ...E N G L I S H 100 150 200 250 300 350 INSTALLATION AND SERVICING INSTRUCTIONS MODULEX EXT...
Page 32: ...32 Instructions for the installer THERMOSTAT FBR 2 CONNECTION room sensor...
Page 33: ...33 Instructions for the installer MODULATING THERMOSTAT CONNECTIONS...
Page 35: ...35 Instructions for the installer...
Page 37: ...37 Instructions for the installer Sensor terminal assignments Terminal assignments BCM...