5.Rated Road Chart
Boom section 1・1+2
Working Radius (m)
1.0
1.4
1.5
1.8
2.0
2.5
3.0
3.5
3.835
Ratid Road
2.9
2.9
2.65
2.25
2.05
1.65
1.3
1.0
0.9
(t)
2.0
2.0
2.0
1.45
1.1
0.65
0.49
0.35
0.25
Boom section 1+2+3
Working Radius (m)
2.2
2.5
2.9
3.0
3.5
4.0
4.5
5.0
5.37
Ratid Road
1.35
1.35
1.35
1.25
1.0
0.8
0.65
0.52
0.43
(t)
0.8
0.65
0.53
0.5
0.38
0.28
0.22
0.16
0.12
Boom section 1+2+3+4
Working Radius (m)
3.4
3.8
4.0
4.5
5.0
5.5
6.0
6.5
6.89
Ratid Road
0.85
0.85
0.75
0.6
0.5
0.42
0.36
0.32
0.27
(t)
0.42
0.34
0.3
0.25
0.19
0.14
0.1
0.08
0.06
Boom section 1+2+3+4+5
Working Radius (m)
3.8
4.1
4.5
5.0
5.5
6.0
6.5
7.0
8.00
8.41
Ratid Road
0.55
0.55
0.45
0.37
0.31
0.27
0.23
0.2
0.15
0.13
(t)
0.35
0.29
0.25
0.2
0.16
0.13
0.1
0.07
0.04
0.03
Caution
●How boom-sections are extended
Boom:1
All boom sections are retracted.
Boom:1+2 or 2
Boom section(2) only is extended.
Boom:1+2+3 or 3
Boom sections(2) and (3) are extended.
Boom:1+2+3+4 or 4
Boom section(4) is extended to the mark
Boom:1+2+3+4+5 or 5
Boom-section(2),(3),(4),and(5) are fully extended.
Outrigger Max EXT.
Outrigger Not Max EXT.
Outrigger Max EXT.
Outrigger Not Max EXT.
Outrigger Max EXT.
Outrigger Not Max EXT.
Outrigger Max EXT.
Outrigger Not Max EXT.
■The rated load is performance when the crane is placed level and is based on an actual operating radius
including boom deflection under load.The rated load is also based on strength and stability of the crane.
■Maximum extension of an outrigger is a condition in which the inner box is extended to the maximum extension
position and a swing lock pin of the outrigger arm is inserted into the normal position. In other conditions than
the above,operate with performance of not maximum extension.
■If any one of the four outriggers is not fully extended,operate with performance of not maximum extension.
■Improper set-up of the outriggers may cause the crane to turn over. Place the outriggers on a firm and level
surface with maximum extension.Make sure,then,that lock pins are securely inserted.
Boom1
Boom4
Boom5
Boom3
Boom2
Boom1 Boom2
Boom1 Boom2 Boom3
Boom1 Boom2 Boom3 Boom5
Boom1 Boom2 Boom3 Boom4
Boom5
(5−1)
Summary of Contents for URW295CR
Page 1: ...MAINTENANCE MANUAL FURUKAWA UNIC CORPORATION URW295CR ...
Page 36: ... 9 5 9 5 Back pressure valve O ring 731191018 Back pressure valve Gauge port ...
Page 94: ... QQO VQR KP FGVCKN ...
Page 100: ... 9 4 412 4 6 0 0 0 5 KOKV UYKVEJ ...
Page 124: ... 㧟㧞 ...
Page 125: ... ...