Page 1: ...P N 110401103773X DATE 2018 06 26 REV 2...
Page 2: ...CONTENTS I Introduction to UT312 Product 1 II Unpacking Inspection 2 III Safety Notices 2 IV Instrument Structure 3 V Instrument Setup and Operation 4 VI Technical Indicators 6 VII Maintenance 7...
Page 3: ...s an ideal tally instrument I INTRODUCTION TO UT312 PRODUCT Please unpack and check if following items are deficient or damaged or not Please contact the nearest sales service agent of our company if...
Page 4: ...e pay attention to protect LCD of vibration meter to avoid scratch or crush 1 Instrument structure shown in Figure 1 and Form 1 1 Signal wire of sensor 2 Sensor 3 LCD 4 Three gear toggle switch 5 Shel...
Page 5: ...measurement key again Data will be maintained for 1 minute after loosening the key and instrument will power off automatically at the same time Note Please tighten clasp when connecting signal wires a...
Page 6: ...gnal wires of sensor constantly because instrument may not display due to damage or poor contact of such wires It is not allowed to pull or drag signal wires forcefully Sensor core is closed completel...
Page 7: ......