- 6 -
3) Pour oil into the Oilers. (See Fig. 4 ~ 6)
4. Electrical Connections
Make all electrical connections in accordance with the following procedures.
1) Connect the power lines to the motor terminals before fitting the belts.
2) Check the fuses at the terminal. The fuses should be rated at the value
shown in the following table.
Type Motor
Fuse
PKS-016 2.2
kW
(4P)
20A
PKS-030 3.7kW
(4P)
30A
PKS-070 11kW
(6P)
100A