Ultrasonic UltraSystem PowerPlus Installation Manual Download Page 7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

For transducer positioning and installation, please refer to the separate manual enclosed 
which will be relevant to the application and type of transducer and mounting bracket 
supplied. 

 

TRANSDUCER POSITIONING and INSTALLATION 

 

FINAL CHECKS

 

1.     

Check the power cable connections:

  correct polarity and protected by fuse/breaker. 

2.     

Check the transducer cable:

  connected at both the transducer and control unit.  Control  

         unit connections for transducers must be as per recommendation in section above 

  

         check! 

3.     

Check the transducer: 

 tight down 

and no further turn can be made….in good contact!

 

SWITCHING ON

 

With the installation checked, switch on the power supply to the Ultra

System.

  Switch on the 

Control unit and the LED status lights will show at the top. 

 

 

FINAL CHECKS AND SWITCHING ON 

 

Connect the transducers to the control unit output sockets (TR1, TR3, TR2 & TR4) according to 
the number of transducers being used as follows: 

1 transducer 

  connect to TR1 

2 transducers 

 connect to TR1 and TR2 

3 transducers 

 connect to TR1, TR2 and TR3 

4 transducers 

 connect to TR1, TR2, TR3 and TR4 

Please note:

 the output sockets are not marked in numerical order. 

 

 

 

TRANSDUCER CONNECTION TO CONTROL UNIT 

 

IMPORTANT!

 

 

Summary of Contents for UltraSystem PowerPlus

Page 1: ...MARINE GROWTH PREVENTION SYSTEM MGPS Manual ref 29 01 2019 UltraSystem PowerPlus INSTALLATION MANUAL Control unit...

Page 2: ...W THESE INSTRUCTIONS CAREFULLY This system must be installed in accordance with the instructions in this handbook Failure to do so could result in poor product performance personal injury or damage WA...

Page 3: ...length of cable supplied which connect the transducers to the control unit Extension cables are available if required in 4 8 and 10m lengths CONTROL UNIT LOCATION CONTROL UNIT INSTALLATION mounting 1...

Page 4: ...____________________________________ CABLE LAYOUT and ELECTRICAL CONNECTIONS ELECTRICAL CONNECTIONS AC VOLTAGE The AC version is supplied with a fixed cable and plug The plug can be removed if wiring...

Page 5: ...4 DC SYSTEM SYSTEM SCHEMATIC DIAGRAM DC...

Page 6: ...5 AC SYSTEM SYSTEM SCHEMATIC DIAGRAM AC...

Page 7: ...ove check 3 Check the transducer tight down and no further turn can be made in good contact SWITCHING ON With the installation checked switch on the power supply to the UltraSystem Switch on the Contr...

Page 8: ...up to 5 seconds both the green and red LED lights will show Note the LED lights are located at the top of the housing their meaning as follows LED 1 ON system is on Light flashes every one second at t...

Page 9: ...ting for correct operation and the output delivery of 24vdc to the PCB GREEN flashing two flashes followed by ON for 3 seconds Overload on output Check the plugs and cables of the transducers for poss...

Page 10: ...Serial number NOTES...

Page 11: ...Ultrasonic Antifouling Ltd Arena Business Centre Holyrood Close Poole Dorset BH17 7FJ England T 44 0 1202 606 185 E info ultrasonic antifouling com www ultrasonic antifouling com...

Reviews: