Ultrasonic UltraSystem PowerPlus Installation Manual Download Page 3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The control unit should be located in a dry and ventilated locker or compartment above 
water line level.  Water ingress into the unit must be avoided at all times.   

Keep away from sources of high temperatures such as heater outlets and exhaust pipes. 

Mount vertically to allow a good free flow of air through the vents located top and bottom 
of the housing.  Efficient cooling is required to provide optimum operation, therefore the 
vents must not be covered or blocked. 
 
Consideration should be made for the length of cable supplied which connect the 
transducers to the control unit.   

 

Extension cables are available if required in 4, 8 and 10m lengths.

 

 

 
 

 

CONTROL UNIT LOCATION 

 

CONTROL UNIT INSTALLATION (mounting) 

 

1.  For mounting the control unit, remove the housing lid to access the four rear  

        

holes (fig.1) 

Care should be taken to protect the electronics when working with   

       

 the cover removed. 

 

2.  Hold the unit in the desired position and mark each hole (fig.2).  Alternatively, 

the measurements for hole centres are marked on the rear of the housing. 
 

3.  Drill each mark for either 10g self-tapping screws or M5 machine screws  

       

depending on your installation. 

 
 

                 Fig.1   

 

 

 

 

 

 

 

 

 

Fig.2 

 
 
 
 

 

 
 

 
 

 

 

 

Remove cover (6 x screws). 

Position and mark holes for 
drilling. 

Summary of Contents for UltraSystem PowerPlus

Page 1: ...MARINE GROWTH PREVENTION SYSTEM MGPS Manual ref 29 01 2019 UltraSystem PowerPlus INSTALLATION MANUAL Control unit...

Page 2: ...W THESE INSTRUCTIONS CAREFULLY This system must be installed in accordance with the instructions in this handbook Failure to do so could result in poor product performance personal injury or damage WA...

Page 3: ...length of cable supplied which connect the transducers to the control unit Extension cables are available if required in 4 8 and 10m lengths CONTROL UNIT LOCATION CONTROL UNIT INSTALLATION mounting 1...

Page 4: ...____________________________________ CABLE LAYOUT and ELECTRICAL CONNECTIONS ELECTRICAL CONNECTIONS AC VOLTAGE The AC version is supplied with a fixed cable and plug The plug can be removed if wiring...

Page 5: ...4 DC SYSTEM SYSTEM SCHEMATIC DIAGRAM DC...

Page 6: ...5 AC SYSTEM SYSTEM SCHEMATIC DIAGRAM AC...

Page 7: ...ove check 3 Check the transducer tight down and no further turn can be made in good contact SWITCHING ON With the installation checked switch on the power supply to the UltraSystem Switch on the Contr...

Page 8: ...up to 5 seconds both the green and red LED lights will show Note the LED lights are located at the top of the housing their meaning as follows LED 1 ON system is on Light flashes every one second at t...

Page 9: ...ting for correct operation and the output delivery of 24vdc to the PCB GREEN flashing two flashes followed by ON for 3 seconds Overload on output Check the plugs and cables of the transducers for poss...

Page 10: ...Serial number NOTES...

Page 11: ...Ultrasonic Antifouling Ltd Arena Business Centre Holyrood Close Poole Dorset BH17 7FJ England T 44 0 1202 606 185 E info ultrasonic antifouling com www ultrasonic antifouling com...

Reviews: