13
CABLE MANAGEMENT
SPARTAN
CABLE MANAGEMENT
1. Connect cables (blue) to the display panel and run-down cable management arms as per diagram below.
Make use of Cable Ties provided as indicated in the diagram below (black lines). There is a small
clearance between the frame members and the timber closure panel, allowing the use of the Cable Ties.
2. Be sure to allow the extra cable length on the cable management arm. Be careful to avoid potential
pinching of cables, particularly around the cut-out area.
3. Reconnect power to the lift.
Please Note:
Cables must be securely attached to the frame to avoid pinching of the cables. Raise and lower
the lift several times using the controller, closely watching the cables to make sure they do not interfere with
the lift operation. The
Installer
is responsible for ensuring the cables do not interfere with the mechanism as
the unit raises and lowers.
A
CABLE EXITS
FRAME
DETAIL
A
RUNNING CABLE OUT AND ALONG TILT FRAME
CABLE TIE POINT