Page
11
of
29
Issue: 4 - 16/08/18
7.3 Cable management system
Cable management fixings are located on each side of the mattress underneath the flap of the cover.
The mains power cable should be secured through the cable management fixing as follows:
Locate each cable management fixing.
If necessary, open the press studs.
Run the mains power cable along the side of the mattress securing each fixing loop around
the cable using the press studs
.
7.4 Connecting mattress to the power unit
Remove the cover of the air pipe connector and connect the air
pipe connector to the power unit and then ensure that the air tubes
are free from any kind of obstruction, and are not kinked.
Plug the power cable into a suitable electrical socket and switch
‘ON’
using mains power switch found at the side of the power unit.
All indicators on the control panel will light up. The
Standby
indicator on the control panel will light up.
Push the
Operate
button and the system will start inflation and the
Auto-Firm
indicator will flash.
Once the mattress is fully inflated, you can then set the mattress to
the appropriate setting suitable for the patient.
Caution: The power unit must only be connected to the mattress recommended by
the manufacturer. Do not use it for any other purpose.
Note: Ensure that the CPR valve is in the closed position.
Summary of Contents for UPRA3678D-2
Page 2: ...Page 2 of 29 Issue 4 16 08 18...
Page 26: ...Page 26 of 29 Issue 4 16 08 18...
Page 27: ...Page 27 of 29 Issue 4 16 08 18...
Page 28: ...Page 28 of 29 Issue 4 16 08 18...