41.
Then push the Dibond cap
on the Z-table so it falls on
the bearings, press it firmly
so that the bearings are in
firmly into place
42.
Then lock it in place with
2 x 16 mm bolts m3 inserted
from the bottom.
43.
The heated bed cable
is guided by giving it an
extra loop through the
plate in the bottom. this
way, he can not get cau-
ght underneath the bed..
35