Instructions for use (rev 05/18)
e.ON SINTER
UGIN DENTAIRE
40
3)
Closing the platform and start cycle
When the cycle has been selected and setting (see previous chapters):
-
close the platform: press “arrow key upward” on touch screen
, and
-
start the cycle: press “run” key on touch screen
Or start the cycle directly with the “run” key.
6.8.
Example: cycle for Zirconia block Ireland
Example: cycle for Zirconia block Ireland
Sequence of cycle
Sintering curve
Stage
Temperature
(°C)
Time
(minutes)
1.
10°C/min, time required: 30 minutes
1
C1: 0
T1: 30
2.
17,5°C/min, time required: 40 minutes
2
C2: 300
T2: 40
3.
4,83°C/min, time required: 100 minutes
3
C3: 1000
T3: 100
4.
Remains: time required 120 minutes
4
C4: 1480
T4: 120
5.
Cooling 13°C/min, time required: 52 minutes
5
C5: 1480
T5: 52
6.
Natural cooling
6
C6: 800
T6: -121
Total programmed time: 342 minutes (5 hours 42 minutes)
Natural cooling time: 268 minutes (4 hours 28 minutes)
Total cycle time : 610 minutes (10 hours 10 minutes)
Summary of Contents for e.ON SINTER
Page 2: ......