18
Instructions: “Shutdown” and “standby” , “startup” and “activation” in Chinese have the same
meaning.
3) Installation of the lithium battery, wiring and startup.
Make the battery pack in a standby state, install it in the battery cabinet one by one, the anode and
cathode of the battery pack are connected respectively, which are connected to the switching mode power
supply or UPS (Please note that the switching mode power supply and UPS shall be disconnected from the
AC). Press the reset key RST of one of battery packs for 3S for startup. Such startup battery may activate
other batteries which are connected in parallel (or press the reset key RST of each battery pack for 3S
successively) and the whole battery pack with high capacity enters the working state. Later, apply AC to
the power supply equipment such as switching mode power supply and UPS to make the whole standby
system run.
The specification of the connecting line is selected according to the load current, it is
suggested to select 35mm2 copper wire. (connection line 1/1pcs) 1000mm.
(connection line 2/1pcs) 1000mm
Introduction to operation steps in detail according to the capacity required:
•
Battery pack in parallel (the wiring diagram is shown in Figure 1 or Figure 2):