background image

 

 

 

12 

CPBatMan080212

 

 

 

UNIVERSAL FLOW MONITORS, INC. 

WARRANTY INFORMATION

 

 

1) ACCEPTANCE AND INTEGRATION CLAUSE: This 
Sales Order Acknowledgment and the sales order 
information that Universal Flow Monitors, Inc. 
("Universal") attaches to or associates with it (herein 
"Acknowledgment"), constitutes an acceptance by 
Universal of an offer by the buyer upon the conditions and 
terms and at the prices stated in this Acknowledgment. 
The Acknowledgment contains the entire understanding of 
Universal and the buyer regarding the subject matter of 
said Acknowledgment. This Acknowledgment may only be 
modified by a written agreement signed by the party 
against whom enforcement is sought.  
2) WAIVER: Waiver by Universal of any default(s) by the 
buyer shall not constitute waiver by Universal of any of the 
conditions of the agreement between Universal and the 
buyer as set forth hereunder with respect to any further or 
subsequent default by the buyer.  
3) FORCE MAJEURE: Universal shall not be responsible 
for failure or delays in deliveries due to fire, strikes, 
breakdowns, acts of God, failure of carriers, inability to 
secure required materials, or other causes beyond 
Universal's control. Buyer waives any claims for damage 
arising by virtue of delay in delivery of material by 
Universal.  
4) LIMITED WARRANTY:  
(a) Warranty. 
For a period of one year from the date of 
manufacture, Universal warrants that each product 
covered by this Acknowledgment will be free from defects 
in material and workmanship. In order to qualify for any 
remedy provided in this Acknowledgment, buyer must give 
notice to Universal within the one-year period, return the 
product to Universal freight paid and intact with Material 
Safety Data Sheets covering all substances passing 
through the product or that form a residue on the product.  
(b) Exclusive Remedy. The buyer's EXCLUSIVE REMEDY 
for failure of any product to conform to any warranty or 
otherwise for any defect is, at Universal's sole option: (i) 
repair; (ii) replacement; or (iii) refund of the entire 
purchase price for the specific product. Without limiting 
the foregoing, in no case will Universal be liable for de-
installation of any defective product or installation of any 
repaired or replaced product. THIS REMEDY IS THE 
EXCLUSIVE REMEDY AVAILABLE TO THE BUYER OR ANY 
OTHER PERSON. UNIVERSAL SHALL NOT BE LIABLE FOR 
ANY DIRECT, INDIRECT, INCIDENTAL, CONSEQUENTIAL, 
SPECIAL, PUNITIVE, OR OTHER DAMAGES IN 
CONNECTION WITH ANY CAUSE OF ACTION, WHETHER 
IN CONTRACT, TORT, OR OTHERWISE.  

(c) Disclaimer of Other Warranties. The express 
warranty in this Acknowledgment is in lieu of any other 
warranty, express or implied. Without limiting the 
foregoing, UNIVERSAL DISCLAIMS THE IMPLIED 
WARRANTY OF MERCHANTABILITY AND ANY IMPLIED 
WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE.  
(d) Special Note About Fitness for a Particular 

Purpose.  This website and other materials of Universal 

may place products into, or display products in, categories 

according to function, size, construction, materials, or 

other property. This is for organizational purposes only 

and NO PLACEMENT OF ANY PRODUCT IN ANY 

CATEGORY OR ANY PRESENTATION OF A PRODUCT IN 

RELATION TO OTHER PRODUCTS WILL CONSTITUTE A 

WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE.5) 

PROHIBITEDUSES: As a condition of the sale of goods 

or services, buyer will not use, sell, distribute, or otherwise 

transfer for use, or permit to be used, sold, distributed, or 

otherwise transferred any product purchased from 

Universal for any of the following uses:  

(a) Nuclear Energy Applications. Any application 

involving, directly or indirectly: (i) exposure of any product 

to any hazardous properties of nuclear material; (ii) 

dependence on the proper functioning of the product for 

the operation of a nuclear facility by any person or 

organization; (iii) use in or for any equipment or device 

used for the processing, fabricating or alloying of special 

nuclear material if, at any time, the total amount of such 

material on the premises where such equipment or device 

is located consists of or contains more than 25 grams of 

(A) Plutonium (any isotope) or Uranium 233 or any 

combination thereof; (B) more than 250 grams of Uranium 

235; (iv) use in, or for the control of any aspect of, any 

structure, basin, excavation, premises or place prepared or 

used for the storage or disposal of waste. The foregoing 

include, without limitation, any application involving 

nuclear material contained in spent fuel or waste that is 

possessed, handled, used, processed, stored, transported 

or disposed of, any application related to the furnishing of 

services, materials, parts or equipment in connection with 

the planning, construction, maintenance, operation or use 

of any nuclear facility.  

(b) Aircraft Applications. Any application involving 

direct or indirect installation in or on, or use in connection 

with, any aircraft or aircraft product.  

(c) Definitions. As used in this section, the following 

definitions apply, whether the terms use initial capitals or 

not.  

"Aircraft"  includes powered and non-powered winged 

aircraft, missiles, spacecraft, and other aeronautical craft 

or mechanisms.  

"Aircraft product" includes:  

Summary of Contents for CoolPoint CP12-V8

Page 1: ...ion and Operation Manual Vortex Shedding Flowmeters Series CP V8 Battery operated UNIVERSAL FLOW MONITORS INC 1755 East Nine Mile Road PO Box 249 Hazel Park MI 48030 0249 TEL 248 542 9635 FAX 248 398 4274 Website http www flowmeters com ...

Page 2: ...TABLE OF CONTENTS 1 PROPRIETARY NOTICE 2 USING THIS MANUAL 2 QUICK SET UP 3 INSTALLATION 4 GENERAL SPECIFICATIONS 5 OPERATION 6 APPLICATIONS 6 MODEL CODES 7 PRESSURE DROP CHARTS 7 DIMENSIONS 8 RMA NOTICE RETURN MERCHANDISE AUTHORIZATION 9 RMA FORM 11 WARRANTY INFORMATION 12 ...

Page 3: ...roduction other than in connection with the installation operation and maintenance of the equipment described herein Universal Flow Monitors Inc reserves the right to change the information contained in this publication at any time and without prior notice USING THIS MANUAL In order to use this manual you will need the model code that can be found on the nameplate of the flowmeter as shown on the ...

Page 4: ...FIGURATION OF METER At start up display shows 1 888 8 8 showing that its digits are all functional 18888 8 8 Then model is shown CP6 1 0 Example Run mode achieved Flow rate displayed at 0 flow is 0 0 00 Note that if no adjustments are made GPM displays SELECTING GPM LPM OR CMH Depress MENU button to display flow in GPM LPM or CMH TOTALIZER FUNCTION Depress SELECT button to display total flow To ch...

Page 5: ...pstream of the meter as well as 5 pipe diameters downstream Isolation ball valves when used should be in the full open position Throttling valves should always be placed downstream of the meter A minimum straight run of 50 pipe diameters is required between an upstream valve and the flowmeter If Teflon tape or pipe sealant is used the user must ensure that no loose parts become wrapped around the ...

Page 6: ...ax flow Flow Capacities 3 4 25 GPM 95 LPM 1 50 GPM 190 LPM 1 1 2 100 GPM 380 LPM 2 200 GPM 750 LPM Turndown Ratio max to min flow 10 1 standard Process Connections Female NPT with BSPP and BSPT optional Wetted Parts Body is brass or 316 Stainless Steel Sensor is PVDF or PEEK Seals are Viton Display 3 digit LCD 6 digit LCD Totalizer mode only Displays in GPM LPM and CMH Digit height 0 3 Power 3 AA ...

Page 7: ... low viscosity clean or dirty water like liquids that are compatible with brass PVDF and Viton Metered fluids should not include long fibers or a significant level of abrasive solids Should abrasive wear occur over time bluffs as well as the sensors are replaceable Typical applications include cooling loops using water 50 solutions of glycol and water soluble machine coolant up to 10 These applica...

Page 8: ...7 CPBatMan080212 UNIVERSAL FLOW MONITORS INC MODEL CODES PRESSURE DROP CHARTS ...

Page 9: ...8 CPBatMan080212 UNIVERSAL FLOW MONITORS INC DIMENSIONS ...

Page 10: ...eturned goods must be shipped prepaid or they will be rejected REPAIRABLE MATERIAL Written or verbal authorization to proceed with the repair under an assigned Purchase Order must be received within 30 days of repair quotation If the unit s are repaired the 90 00 evaluation charge will be applied to the quoted repair costs If no repairs are authorized within this 30 day period the customer will be...

Page 11: ... the customer If no disposition is received by UFM within 30 days the goods will be scrapped and the 90 00 evaluation fee will be billed WARRANTY RETURNS Warranty returns must be shipped prepaid to UFM UFM will review the goods and advise the customer of the evaluation and validity of the warranty claim Valid warranty claims will be repaired or replaced at no charge No evaluation fee will be charg...

Page 12: ...11 CPBatMan080212 UNIVERSAL FLOW MONITORS INC RMA FORM ...

Page 13: ...ION WHETHER IN CONTRACT TORT OR OTHERWISE c Disclaimer of Other Warranties The express warranty in this Acknowledgment is in lieu of any other warranty express or implied Without limiting the foregoing UNIVERSAL DISCLAIMS THE IMPLIED WARRANTY OF MERCHANTABILITY AND ANY IMPLIED WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE d Special Note About Fitness for a Particular Purpose This website and other ...

Page 14: ... packaging waste Nuclear material means source material special material or by product material Nuclear reactor means any apparatus designed or used to sustain nuclear fission in a self supporting chain reaction or to contain a critical mass of fissionable material Property damage includes all forms of radioactive contamination of property Source material special nuclear material and by product ma...

Reviews: