background image

  

  

UES AG 

PowerFill Operating Manual 

11

A1

A2

K2

A1

A2

K3

13

14

13

14

13

14

13

14

KR

.

.

.

.

0V

.

Sensor A

uswe

rt

ung

Kontakt Anlage

Neuer Kontakt

Anlage Read

y

Signal Störung Po

werF

ill

Mass

e

.

.

.

A3

A3

.

X1,

1

2

.

4

35

678

91

0

.

11

12

.

13

br

bl

ro

t

sw

3

21

22

-S

24V DC

104405

13

14

A1

A2

K1

24

 V

 Mag

. Ve

ntil

Masse (rot

)

Anschluss Steuerbo

x 102443

X1, 6 Neuer "Ready" Kontakt Anlag

e

X1, 7 Neuer "Ready" Kontakt Anlag

e

X1, 8 A

uswe

rt

er Masse (rot)

X1, 9 24 

V Mag

. Ve

ntil

X1,13 Mag

. Ve

ntil Masse

X1,10 Störung 

Po

werF

ill

X1,11 Störung 

Po

werF

ill

X1. 1 24 

VDC

X1,12 0V

X1, 4 Ready Kontakt Anlag

e

X1, 5 ReadyKontakt Analg

e

Circuit diagram special functions

Summary of Contents for PowerFill

Page 1: ...PowerFill Automatic Granules Feeder for Third Party Systems Operating Manual...

Page 2: ......

Page 3: ...the glue 5 Safety precautions relating to the production machine 5 Safety Symbols 6 Functional description 7 Versions 7 Part list 7 Compressed air supply 7 Technical Data 7 Commissioning 8 Maintenanc...

Page 4: ...dbooks of the UES AG are protected by copyright Any copying duplication also extracts translations etc are not allowed without prior consent of the UES AG Further copies of this operation manual and o...

Page 5: ...he following conditions Near escaping substance or exploding gases or materials Without the appropriate safety appliances Temperatures lower than 5 C and more than 45 C Safety precautions regarding th...

Page 6: ...ines Additional special safety instructions can follow Caution hot surface Danger of burning Appliance parts have a high operating temperature Caution high voltage This type of work is only to be carr...

Page 7: ...UES PowerFill operates with compressed air and is almost maintenance free Versions PowerFill is available for different hotmelt systems Nordson 3100 3400 Pro Blue Compact SE Compact 2 Compact 2 12 18...

Page 8: ...ional 230V AC power supply Establish a ground connection between the controler unit and the tank red cable core Deposit the lance in the material storage tank Adequate mobility must be ensured for opt...

Page 9: ...UES AG PowerFill Operating Manual 9 Sensor Ground Connection Power Plug Solenoid Valve Power Supply Controler Box Interpreter Set Screw Clamps 1 to 14...

Page 10: ...and X7 The fill level of the tank is monitored Once the system is ready to use the automatic granules feeder PowerFill is switched on and fills the tank up to the adjusted filling level For this the s...

Page 11: ...11 12 13 br bl rot sw 3 21 22 S 24V DC 104405 13 14 A1 A2 K1 24 V Mag Ventil Masse rot Anschluss Steuerbox 102443 X1 6 Neuer Ready Kontakt Anlage X1 7 Neuer Ready Kontakt Anlage X1 8 Auswerter Masse...

Page 12: ...UES AG Breuershofstr 48 D 47807 Krefeld Tel 49 2151 72950 Fax 49 2151 729578 info ues ag net www ues ag net Rev 2 1 Stand 03 2014...

Reviews: