OPERATION
Properly install batteries. Switch in
middle for power off, switch
up for CW output, switch down
for flashing output.
VFF1
1
Compact and intelligent design
assists in locating breakpoints
of a fiber.
3
(1)
Always vertically insert and remove the fiber connector. Otherwise, the ceramic tube may break.
(2)
The connector must be well polished and cleaned.
MAINTENANCE
Choose a continuous wave
output mode for steady fault
illumination or a flashing output
mode by pushing the switch up
or down.
2
Summary of Contents for TEK-1
Page 2: ...SECTION ONE LSMM LED LIGHT SOURCE QUICK START GUIDE NORTH AMERICA...
Page 8: ...SECTION TWO LSMM LED LIGHT SOURCE TECHNICAL GUIDE NORTH AMERICA...
Page 11: ...SECTION THREE LSSM LASER LIGHT SOURCE QUICK START GUIDE NORTH AMERICA...
Page 18: ...SECTION FOUR LSSM LASER LIGHT SOURCE TECHNICAL GUIDE NORTH AMERICA...
Page 21: ...SECTION FIVE OPM1 OPTICAL POWER METER QUICK START GUIDE NORTH AMERICA...
Page 28: ...SECTION SIX OPM1 OPTICAL POWER METER REFERENCE TEST GUIDE NORTH AMERICA...
Page 40: ...SECTION SEVEN HFM1 HANDHELD INSPECTION MICROSCOPE QUICK START GUIDE NORTH AMERICA...
Page 43: ...SECTION EIGHT VFF1 VISUAL FAULT FINDER QUICK START GUIDE NORTH AMERICA...