background image

20/1/23, 12:11

IS-5AC Quick Start Guide

https://dl.ui.com/qsg/IS-5AC/IS-5AC_EN.html

2/15

and the other at the entry point to the building. The ETH-SP will absorb power
surges and safely discharge them into the ground.

Hardware Overview

IS-5AC Quick Start Guide

Summary of Contents for IS-5AC

Page 1: ...ench or screwdriver Shielded Category 5 or above cabling with drain wire should be used for all wired Ethernet connections and should be grounded through the AC ground of the PoE We recommend that you...

Page 2: ...tart Guide https dl ui com qsg IS 5AC IS 5AC_EN html 2 15 and the other at the entry point to the building The ETH SP will absorb power surges and safely discharge them into the ground Hardware Overvi...

Page 3: ...LAN and DHCP server To reset to factory defaults press and hold the Reset button for more than 10 seconds while the device is powered on Alternatively the device may be reset remotely via a Reset but...

Page 4: ...20 1 23 12 11 IS 5AC Quick Start Guide https dl ui com qsg IS 5AC IS 5AC_EN html 4 15 1 2 Pole Mounting 1 IS 5AC Quick Start Guide...

Page 5: ...20 1 23 12 11 IS 5AC Quick Start Guide https dl ui com qsg IS 5AC IS 5AC_EN html 5 15 2 Connecting Power 1 IS 5AC Quick Start Guide...

Page 6: ...20 1 23 12 11 IS 5AC Quick Start Guide https dl ui com qsg IS 5AC IS 5AC_EN html 6 15 2 3 IS 5AC Quick Start Guide...

Page 7: ...20 1 23 12 11 IS 5AC Quick Start Guide https dl ui com qsg IS 5AC IS 5AC_EN html 7 15 4 5 6 Connect the power using IS 5AC Quick Start Guide...

Page 8: ...apter and then plug the Power Cord into a power outlet Mounting the PoE Adapter Optional 1 Remove the PoE Mounting Bracket from the adapter place the bracket at the desired location and mark the two h...

Page 9: ...your web browser and go to http setup ui com 3 Select your Country and Language You must agree to the Terms of Use to use the product Click Continue 4 Create a username and password Confirm your new...

Page 10: ...Default Horn Networking Interface 1 10 100 1000 Ethernet Port LED Power Max Power Consumption 8 5W Max TX Power 25 dBm Power Supply 24V 0 5A Gigabit PoE Adapter Included Power Method Passive PoE Pair...

Page 11: ...from lightning Electrical Safety Information 1 Compliance is required with respect to voltage frequency and current requirements indicated on the manufacturer s label Connection to a different power...

Page 12: ...undesired operation This equipment has been tested and found to comply with the limits for a Class A digital device pursuant to part 15 of the FCC Rules These limits are designed to provide reasonable...

Page 13: ...io IC 6545A IS5AC a t approuv par ISDE Canada pour l exploitation avec l antenne types num r s ci dessous avec le gain maximal admissible et requis l imp dance de l antenne pour chaque type d antenne...

Page 14: ...uct represents the product is in compliance with all directives that are applicable to it Country List AT BE BG CY CZ DE DK EE EL ES FI FR HR HU IE IT LV LT LU MT NL PL PT RO SE SI SK UK BFWA Broadban...

Page 15: ...20 1 23 12 11 IS 5AC Quick Start Guide https dl ui com qsg IS 5AC IS 5AC_EN html 15 15 Declaration of Conformity Online Resources 2023 Ubiquiti Inc All rights reserved IS 5AC Quick Start Guide...

Reviews: