25.02.2020
EP-54V-150W Qu ck Start Gu de
https://dl.ubnt.com/qsg/EP-54V-150W/EP-54V-150W_EN.html
9/15
Note:
Connect ng to the Management Port s only necessary for
access ng the conf gurat on nterface to conf gure PSU 2 or to mon tor
power.
3.
4.
Install ng a Ground W re
We recommend nstall ng a ground w re for added ESD protect on and as a safety
precaut on.
EP-54V-150W Qu ck Start Gu de