![Ubiquiti EdgePoint R8 Quick Start Quide Download Page 19](http://html1.mh-extra.com/html/ubiquiti/edgepoint-r8/edgepoint-r8_quick-start-quide_3195274019.webp)
3. Separate the fiber optic strands and spool them around the
strain relief reels in the direction of the arrows. Then connect a
fiber optic strand to the fiber module.
50
50
50
100
0Mb
ps S
M/S
C 2
0KM
DD
M
Tx1
550
nm
/Rx1
310
nm
SN
: 13
082
617
9
EF
-10
00
M-
20
KM
-15
50
4. To finish the strain relief:
a. Feed a cable tie (not included) through the tie slot near the
cable opening.
b. Feed an additional cable tie (not included) through the tie
slots at the bottom of the strain relief reels.
50
50
50
100
0Mb
ps S
M/S
C 2
0KM
DD
M
Tx1
550
nm
/Rx1
310
nm
SN
: 13
082
617
9
EF
-10
00
M-
20
KM
-15
50
17
Using SFP Ports (Optional)