UBI EasyCoder 201 II E
UBI EasyPak 501 – Getting Started
11
LOAD THERMAL RIBBON
To install a new thermal ribbon, proceed as follows:
1
Lift the green printhead lever counter-clockwise.
2
Put the full-ribbon stock on the transfer ribbon
supply shaft. Pay attention to how the ribbon is
mounted.
3
Thread the transparent start portion of the ribbon
below the printhead. Pull out approximately 20 cm
(8") more ribbon, measured from the printhead.
4
Lower the green printhead.
5
Fit the rewind core onto the transfer ribbon take-up
shaft. Pay attention to how the core is mounted (see
illustration).
6
Lift the printhead.
7
Manually, or by means of the "Feed" key, rewind
the ribbon until all of the transparent front portion
has passed the printhead.
8
Lower the printhead by turning the green lever to
the "Print" position.
9
Print a few labels to check that ribbon and paper are
fed regularly.
Load