Recommendations for the installation area:

 

|

The heat recovery unit should be installed in an insulated area protected from frost to prevent the evacuated conde sates from 
freezing.

 

|

The heat recovery unit should not be installed in very moist rooms like bathrooms..

 

|

The humidity of the installation area should be permanently lowered with sufficient ventilation.

 

|

To speed the evacuation of moisture in new buildings it is also necessary to ventilate the structure naturally before use.

 

|

To achieve a vibration free result, the heat recovery unit should be wall-mounted with minimum force of 200 kg/m² or be 
placed on a mounting block on a surface with the same minimum force. 

Recommendations for the roof/wall penetrations: 

 

|

The roofs and walls should be completely insulated.

Recommendations for the air conduits: 

 

|

The air conduits should be thermally insulated towards and from the outside. To avoid any risk of condensation, we recom-
mend that flexible insulated tubes should not be used.

 

|

The air conduits must be mounted airtight.

 

|

To reduce the overall noise level we recommend in the design reducing the pressure of the external conduit to 100 Pa in the de-
sign flow. In all cases the external pressure should be limited in practice to a maximum of 150 Pa.

 

|

The air speeds in the main conduit should be limited to 5 m/s maximum in the main channels and 3.5 m/s in the branches.

Recommendations for evacuating the condensates: 

 

|

Ball siphon supplied standard.

 

|

According to the Ubbink instruction sheet.

Recommendations for accessibility:

 

|

For maintenance and cleaning purposes, the unit should always be easy to access.

 

Use of the installation for achieving good air quality in the house:

Good ventilation contributes to healthy air in the house, optimum comfort and good operation of the installation. When a multi-
position switch is used, proceed as follows:

 

|

Position 3: Kitchen/shower mode 
 

100% of the design flow or of the maximum unit capacity

 

|

Position 2: Presence mode 
 

60–70% of the design flow

 

|

Position 1: Absence mode 
 

Ca 30% of the design flow

 

|

Fan symbol: 
 

Holiday mode, Position of minimum ventilation (fixed setting)

Note: 

Apart from the design and installation recommendations given above, the national building and ventilation  

 

regulations must be complied with. For any questions please contact

GB

Summary of Contents for Ubiflux W450 +

Page 1: ...atievoorschrift Ubiflux Vigor W450 W600 Installation instructions Ubiflux Vigor W450 W600 Installationsvorschriften Ubiflux Vigor W450 W600 Consignes d installation Ubiflux Vigor W450 W600 zie see seh...

Page 2: ...2 Art nr 617095...

Page 3: ...enu de la livraison Ubiflux Vigor W450 W600 Documentation 1x manuel court 1x siphon Kit d trier de suspension murale 1x band de suspension 2x petits butoirs 2x bande en caoutchouc 2x rondelles en caou...

Page 4: ...tand the hazards involved Children shall not play with the appliance Cleaning and user maintenance shall not be made by children without supervision Dieses Ger t kann von Kindern ab 8 Jahren und dar b...

Page 5: ...09 125 EG 1253 1254 EU EU ErP directive Das oben beschriebene Produkt erf llt die nachfolgenden Richtlinien 2014 35 EU Niederspannungsrichtlinie 2014 30 EU EMV Richtlinie RoHS 2011 65 EU Gefahrstoff R...

Page 6: ...0 Zone climatique Type de commande Valeur SEC kWh m a Classe nerg tique SEC Consommation lectrique annuelle CEA kWh conomie de chaleur annuelle EAC kWh Moyenne Manuel 40 06 A 283 4646 Horloge 40 76 A...

Page 7: ...600 Zone climatique Type de commande Valeur SEC kWh m a Classe nerg tique SEC Consommation lectrique annuelle CEA kWh conomie de chaleur annuelle EAC kWh Moyenne Manuel 38 02 A 358 4630 Horloge 38 92...

Page 8: ...evolen in het ontwerp de externe kanaaldruk te beperken tot maximaal 100Pa bij het ontwerpdebiet In elk geval moet in de praktijk de externe druk worden beperkt tot maximaal 150Pa De luchtsnelheden in...

Page 9: ...uce the overall noise level we recommend in the design reducing the pressure of the external conduit to 100 Pa in the de sign flow In all cases the external pressure should be limited in practice to a...

Page 10: ...den Gesamtger uschpegel zu verringern wird empfohlen den Druck des u eren Kanals in der Durchflussplanung auf 100 Pa zu verringern In der Praxis ist der Au endruck in jedem Fall auf 150 Pa zu begrenze...

Page 11: ...veau de bruit global on recommande de r duire dans la conception la pression du conduit externe 100Pa dans le flot de conception Dans tous les cas on doit limiter dans la pratique la pression externe...

Page 12: ...nfo bouw ubbink be Ubbink UK Ltd Mansard Close Westgate Industrial estate Northampton NN5 5DL Tel 44 0 1604 433000 www ubbink com sales ubbink co uk Copyright 2022 Ubbink Content is subject to change...

Reviews: