3
UNPACK AND INSPECT
Remove the packing from the appliance and inspect for any damage. Your appliance is packed with the door handle spring not
installed. Remove the door handle spring from the packaging and attach it to the door handle as shown.
Ensure that the bricks are positioned correctly and not broken (see illustration for proper brick arrangement). Make sure that the
baf
fl
e board, above the air tubes, is in place and undamaged. (DO NOT REMOVE)
TOOLS AND MATERIALS NEEDED FOR INSTALLATION
1. A 5/16” socket (Best if using a power drill and a socket bit)
2. A pair of pliers or channel-locks
3. A power drill with an 1/8” drill bit to install sheet metal screws into connector pipe.
4. Sheet metal screws
5. A
non-combustible
fl
oor protector as speci
fi
ed in this manual.
6. All chimney and chimney connector components required for your particular venting installation.
Brick Con
fi
guration
41
34
Handle Spring Attachment