background image

Page 3

U.S. FAN INTERNATIONAL

®

P.O. Box 978
Muskogee, Oklahoma 74402

MODELS • UVQ100 • UVQ150

UVQ200 • UVQ250 • UVQ300

,,

yy

,,,,

yyyy

12¼"

9

1

/

2

"

to

10

1

/

2

"

,,,

yyy

,,,,

yyyy

12¼"

1½"

to

2½"

,,,,

yyyy

,,,

,,,

@@@

@@@

€€€

€€€

ÀÀÀ

ÀÀÀ

,,,

,,,

@@@

@@@

€€€

€€€

ÀÀÀ

ÀÀÀ

,,,

,,,

@@@

@@@

€€€

€€€

ÀÀÀ

ÀÀÀ

,,,

,,,

@@@

@@@

€€€

€€€

ÀÀÀ

ÀÀÀ

,,,

,,,

@@@

@@@

€€€

€€€

ÀÀÀ

ÀÀÀ

,,,

,,,

@@@

@@@

€€€

€€€

ÀÀÀ

ÀÀÀ

,,,

,,,

yyy

yyy

,,,

@@@

€€€

ÀÀÀ

,,,

@@@

€€€

ÀÀÀ

,,,

@@@

€€€

ÀÀÀ

,,,

@@@

€€€

ÀÀÀ

,,,

@@@

€€€

ÀÀÀ

,,,

@@@

€€€

ÀÀÀ

,,,

yyy

MOUNTING OPTIONS

WIRING OPTIONS

DUCTING OPTIONS

,,

yy

,,,,

yyyy

12¼"

1

1

/

8

"

MAX.

Mounting brackets in

factory-shipped position.

(Outlet parallel to joists.)

(New construction)

,,,

yyy

,,,,

yyyy

12¼"

10 

3

/

4

"

to

11 

3

/

4

"

,,,,

yyyy

,,,

yyy

,,,

yyy

12¼"

¼-20 hex nuts secure mounting brackets to housing. Loosen and
re-tighten or remove and replace nuts as necessary for desired
mounting bracket position.

Mounting brackets flipped

over and mounted to outlet

sides of housing.

(Outlet parallel to joists.)

(Existing construction)

Mounting brackets mounted

to outlet sides of housing.

(Outlet perpendicular to joists.)

(New construction)

Mounting brackets flipped

over and mounted to top of

sides of housing.

(Outlet parallel to joists.)

(New or existing construction)

,,

yy

,,,,

yyyy

12¼"

1

1

/

2

"

to

2

1

/

2

"

Mounting brackets flipped

over to give approx. 1”

more clearance.

(Outlet parallel to joists.)

(New construction)

Mounting brackets mounted

to top of sides of housing.

(Outlet parallel to joists.)

(New or existing construction)

BLOWER DISCHARGE POSITIONS

WIRING PLATE
POSITION

Wiring plate mounts to side or top of housing.

HORIZONTAL POWER

CABLE CONNECTION

VERTICAL

POWER

CABLE

CONNECTION

Blower and duct connector

in horizontal discharge

position. (Factory shipped)

DUCT

CONNECTOR

DUCT

CONNECTOR

Blower and duct connector

in vertical discharge

position.

BLOWER

BLOWER

Change

blower &

duct

connector

positions for

vertical

discharge.

WARNING: To reduce the risk of electric shock,
disconnect from power supply before servicing.

To clean grille: Use appropriate vacuum attachment or remove
grille  and clean with a soft cloth and mild soap or detergent. Dry
grille thoroughly before reinstalling.

To clean blower assembly: Remove grille, unplug blower from
housing, remove blower mounting nuts, and carefully remove blower
from housing. Use appropriate vacuum attachment or a soft cloth
and mild soap or detergent to clean blower discharge area and
wheel. DO NOT ALLOW WATER TO ENTER MOTOR. Make sure
blower assembly is completely dry before reinstalling.

Motor is permanently lubricated. Do not oil or disassemble motor.

USE AND CARE

Ventilator is designed for continuous operation. If desired, it may
be controlled using an on/off switch or a solid-state, variable speed
control. Follow wiring instructions packed with control, and adhere
to all local and state codes, and the National Electrical Code.

Typical ductwork connection to a ventilator converted to

vertical discharge.

DUCTING

(Vertical blower discharge)

* UVQ100 & UVQ150 use 6” round duct.

UVQ200, UVQ250 & UVQ300 use 8” round duct.

ROUND

DUCT*

ROOF CAP

Reviews: