background image

u-line.com

9

Removing Existing Drawer Fronts

1. Open drawer. Pull drawer gasket out of 

groove (top edge of drawer only). Start in 
the middle and pull outward, moving 
toward the edge. This may take some force. 

2. Remove the two screws located at the ends 

of the handle. Remove the handle.

3. Remove existing vinyl panel and cardboard 

spacer. Discard the spacer.

4. Reinstall handle.

5. Repeat for both drawers.

Preparing the Drawer Frame for Overlay

You have received your drawers with or without holes 
pre-punched into the galvanized steel. If your door does not have 
the punched holes, please use diagram below for hole location 
dimensions.

Preparing Steel Insert

1. With the drawer open and braced, drill 6 holes into the steel 

plate and through the frame using the pre-punched holes as a 
guide. If your panel is not pre-punched, see diagram below for 
hole locations. Repeat for both drawers.

Note: 

Hole location dimensions will not line up with holes in 

pre-punched panel.

Note: 

Be sure to drill completely through frame.

Panel Installation

1. Place prepared panel against drawer front and secure with 

clamps.

2. Be certain the panel is aligned flush with the top of the drawer 

handle. 

3. Using a #6 Drill bit, drill 8 pilot holes into the wood panel 3/8" 

deep.

NOTICE

It is important to ensure that all drilled holes are drilled to 
the correct depth in order to avoid splits in the wood 
when hardware is installed.

4. Locate the 8 #6x2" screws provided in the overlay panel install 

kit. 

5. Using a Phillips head and #6x2 screws, screw the drawer panel 

to the drawer front.

6. Be sure the screws force their way past the opening on the 

gasket channel and sit flush against the bottom of the gasket 
channel.

7. Repeat for both drawers.

Assembling the Drawer Front

NOTICE

The bottom of the lower overlay panel will line up with the 
bottom of the adjacent cabinetry and may not line up with 
the bottom of the actual drawer itself. See graphic below.

1. Starting at the corners and working toward the center, push 

the drawer gasket back into place. Repeat for both drawers.

4-1/16"

9-1/16"

11/16"

7-5/16"

9-5/16"

Steel Plate

Top Down Slice

View

Bottom Of Panel

Drawer Reveal

Panel

Toe Kick

Summary of Contents for U-2275DWRCOL-00

Page 1: ...2000 SERIES U LINE COM INSTALLATION GUIDE U 2275DWRCOL 00 U 2275DWRCOL 02 U 2275DWRCS 00 U C2275DWROL 00 U C2275DWRS 00 DRAWER MODELS The American Built In Undercounter Leader Since 1962...

Page 2: ...gnment 6 Adjusting Drawer Alignment 6 Re installation of Drawer 7 7 Drawer Panel Installation Custom 1 4 Drawer Panel Inserts 8 Drawer Panel Preparation 8 Drawer Panel Installation 8 Full Overlay Draw...

Page 3: ...ily climb inside WARNING SHOCK HAZARD Electrical Grounding Required Never attempt to repair or perform maintenance on the unit until the electricity has been disconnected Never remove the round ground...

Page 4: ...ng a 3 4 Full Overlay panel 3 4 overlay frame material Cutting Tools Drill Drill Bits If installing 1 4 Panel Insert 1 4 thick door panel material Cutting Tools Exterior Cleaning Overlay Models The dr...

Page 5: ...een placed by a qualified electrician The unit requires a grounded and polarized 115 VAC 60 Hz 15A power supply normal household current An individual properly grounded branch circuit or circuit break...

Page 6: ...line com 4 Product Dimensions 2275DWRC Black Stainless Steel 33 7 8 24 23 3 8 3 7 8 23 1 4 33 7 8 24 3 7 8 C2275DWR 2275DWRC Black Stainless Steel 33 7 8 24 23 3 8 3 7 8 23 1 4 33 7 8 24 3 7 8 C2275D...

Page 7: ...d 115 VAC 60 Hz 15A circuit normal household current See Electrical Specifications Water Supply The unit requires a 1 4 inch OD water supply line and a shut off valve For more information see page 12...

Page 8: ...ounting screws drilling new mounting holes and remounting the slide Side to Side Adjustment The drawer will need a Side to Side Adjustment if when viewed from the top the drawer front is not square wi...

Page 9: ...er 1 Loosen one slide s mounting screws 2 Push the slide upward or downward to match the position of the other slide 3 Retighten the screws 4 Repeat the procedure with the other slide if necessary Sev...

Page 10: ...el Preparation A full overlay drawer panel completely covers the drawer frame and handle to give you a built in appearance NOTICE The drawer panel must not weigh more than 10 lbs It is important to en...

Page 11: ...drill completely through frame Panel Installation 1 Place prepared panel against drawer front and secure with clamps 2 Be certain the panel is aligned flush with the top of the drawer handle 3 Using...

Page 12: ...er that the grille assembly can still be removed from the unit Screw Mount Recommended 1 Remove the grille from your unit by removing the two mounting screws See below 2 Lay the back of your grille ov...

Page 13: ...u line com 11 1 4 8 1 2 3 3 32 19 5 8 1 2 1 2 TYP 3X 5 16 TYP 2X 7 16 5 16 10 5 16 11 64 2 1 8 1 2 22 7 8 23 7 8 FULL R Grille Overlay Dimensions 24 Inch Models Grille Drawing...

Page 14: ...e Leave approximately 8 of water line to be coiled behind the appliance The water line should be looped into 2 coils This will allow the line to flex when removing the unit for cleaning and servicing...

Page 15: ...er Remove the appropriate screws for horizontal or vertical mounting Do not discard 2 Insert the screws through the anti tip bracket B and attach the bracket to the unit Tighten screws securely 3 Repe...

Page 16: ...the POWER icon on the display panel for approximately ten seconds until the F symbol flashes and release U Line recommends that the unit be allowed to run overnight prior to loading the refrigerator...

Page 17: ...ne Captain Models Combo Models Refrigerator Freezers Refrigerators Drawer Models and Beverage Centers The U Line brand offers products in the 1000 Series 2000 Series and the Modular 3000 Series The 10...

Reviews: